1) observation procedure
观测步骤
3) I survey steps
施测步骤
5) measurements setup
测量步骤
1.
The black box model for an Erbium-doped fiber amplifier(EDFA) was derived from the two-level amplified model,and the general measurements setup to record the data and measurement cautions for using the black box model were presented.
根据掺铒光纤放大器(EDFA)两能级放大模型推导出黑盒模型(BBM,black box model),随后给出了黑盒模型的通用测量步骤及注意事项。
6) testing procedure
测评步骤
1.
Standard and testing procedures of selecting juvenile Taekwondo athletes;
青少年跆拳道运动员的选材标准与测评步骤
补充资料:大坝内部变形观测(见水工建筑物变形观测)
大坝内部变形观测(见水工建筑物变形观测)
daba neibubianxing guanCe大坝内部变形观测见水工建筑物变形观测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条