1) supply capacity lag
供热容量滞后
2) lagging capacity
滞后容量,滞后电容
3) partial backlogging
短缺量滞后供给
1.
Considering the interrelation between partial backlogging and customers waiting time,this paper develops a VMI model for the vendor to produce an integral number of the buyer s order quantity each time and the unique optimal solution is discussed by mathematical analysis.
考虑短缺量滞后供给与顾客等待时间负相关,提出了供应商生产批量用于满足订货商多次订货需求的VM I模型。
4) Backlogging Rate
短缺量滞后供给率
1.
An EOQ Model with Controllable Lead Time,Setup Cost and Backlogging Rate;
提前期、构建成本和短缺量滞后供给率均可控的EOQ模型
5) demand capacity lag,demand lag
需容滞后
6) heating capacity
供热能力;热容量,热值
补充资料:集中供热(见区域供热)
集中供热(见区域供热)
district heating
集中供热(distriet heating)见区域供热。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条