1) network for interference measurement
干扰测试网路
2) network for interference measurement
干扰测试网络
4) roadwork disturbance
道路网干扰
1.
suberosa is a disturbance-tolerant species which can proliferate mainly by root suckering after roadwork disturbance.
suberosa是一个耐干扰的物种,受道路网干扰后可以通过根出条繁殖。
5) noninterference testing
非干扰测试
6) jamming effectiveness test
干扰效果测试
1.
As the technical development basis of new countermeasure principle and devices, the jamming effectiveness test of IR decoy against point source guided missiles was introduced briefly.
红外诱饵干扰红外点源制导导弹的干扰效果测试 ,是研究红外对抗新原理、新器材的技术基础 。
补充资料:高电压测试的抗干扰措施
高电压测试的抗干扰措施
anti-interference measures in high voltage tests
屏蔽与测量仪器的屏蔽室(柜)相接。 (3)测量仪器采用不间断电源〔UPS)供电,测试时断开外电源连线。若有条件也可采用电池供电。 (4)采用光缆取代测量电缆。如上所述,可避免电源线引入中点电位造成的干扰。 电阻分压器测量系统采用的抗千扰综合措施实例如图所示。 F短却{此D凡日日日日口 R七攀协 抗干扰综合措施实例D一分压器;尺:、凡一高、低压臂电阻;凡、凡一电缆始、终端匹配电阻;C一双屏蔽电缆;E一接地极;一w一金属板接地连线;S一屏蔽室;M一测量仪器; F一电源滤波器;T一隔离变压器good!onya ees卜一dekonggonrooc以o3h}高电压测试的抗千扰措施(anti一interfereneemeasures in high voltage tests)抑制高电压试验中电磁干扰对测控系统影响的各种措施。高电压试验中常有很强的电磁干扰,其主要来源为:①测量和控制电缆外皮中流过的暂态电流;②间隙放电时产生的电磁波辐射;③测量仪器电源线引人的电位和千扰等。其中以电缆外皮中流过的暂态电流引起的电磁干扰常最严重。为此,高电压试验中测控系统必须采取屏蔽、接地、滤波、隔离等抗干扰措施,尤其是数字化的测控系统,由于工作电平很低,措施更需完备。 针对不同的千扰源,相应的抗干扰措施可归纳如下: 减小电缆外皮暂态电流引起的电磁干扰测控系统须妥善接地和改进接线,具体措施为: (1)高压分压器应紧靠接地板,并以最短的宽金属带相连接。 (2)分压器与测量仪器之间敷设金属板或宽金属带作为接地连线。测量电缆应紧靠地面沿此连线敷设,且宜直接敷设在金属板、带之下。 (3)采用双屏蔽同轴电缆或单屏蔽同轴电缆外套一金属管,甚至双屏蔽同轴电缆外再套一金属管。电缆外皮屏蔽或金属管多点接地,至少应两端接地。电缆内层屏蔽在分压器端接地,测量仪器端接地与否由干扰试验确定。 (4)加设共模抑制器。办法是将电缆在铁氧体磁芯环上绕若干圈,或将若干铁氧体小磁环均匀分布地套在电缆上。 (5)测量电缆采取两端匹配的接线方式。 (6)测量仪器具有对称输人通道时,测量电缆可采用平衡接线,即用两条等长度同型号的电缆,始端分别接分压器低压臂两端,末端对称输人到测量仪器,外皮按同样方式接地。这样,两条电缆中形成的电磁干扰可互相抵消。 (7)测量仪器加设外接衰减器,可提高电缆中传递的被测信号,即提高信噪比,以降低千扰对测量的影响。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条