1) phased settlement charges
分段结算
2) settlement period
结算阶段
1.
Aiming at the specialty,complexity and suddenness of the construction projects,the paper from the project bidding period,the construction contract period and the project settlement period illustrates how to undertake the project costs control,points out the relative measures of the project costs control,in order to make the costs management level of the construction enterprises step further.
针对建设工程的特殊性、复杂性及突发性,从工程招投标阶段、施工合同阶段和工程结算阶段就如何进行工程造价控制作了论述,并提出了相应的工程造价控制方法,从而使施工企业的工程造价管理水平及经济效益上一个新台阶。
4) piecewise algorithm
分段算法
1.
A piecewise algorithm for retrieval of suspended sediment concentration based on in situ spectral data by MERIS in Zhujiang River estuary
基于现场光谱数据的珠江口MERIS悬浮泥沙分段算法
2.
In this paper,we discussed piecewise algorithm of a kind of standard Graphs and its application in the shortest path problem in detail,piecewise algorithm and its application has been achieved in computer,a comprehensive algorithm time complexity is O(e),better than traditional methods.
详细讨论一类标准层次图的分段算法及其在最短路径上的应用,分段算法及应用在机器上得到了实现,算法的综合时间复杂度为O(e),较一些传统方法要好。
5) partition computation
分段计算
1.
The general expressions are obtained by using the conclusion from teaching material with the charged square coil considered as four sections charged rods,using partition computation and the principle of superposition of field.
利用教材中一个常见例题的结论,将带电正方形线圈视为四段带电直棒,采取分段计算然后利用场的叠加原理,导出带电正方形线圈空间电场分布的普遍表达式,并讨论线圈平面上的电场分布情况。
6) multi-steps sintering
分段烧结
1.
The results indcated that gradient structure could be formed by multi-steps sintering.
通过连续烧结和分段烧结试验,研究烧结方式对硬质合金梯度结构和合金性能的影响。
补充资料:东汉分段锦铜马
东汉分段锦铜马 东汉时期铜制品。1975、1976年,贵州兴仁、兴义东汉墓出土。铜马系分段铸造,装配而成。全马分头、耳、颈、身躯、尾四肢十一段。除两耳外,其余九段皆砂模空心铸造,装配接头为子母口,由十七个销拴固定。两耳及尾铸成子母口投合后,再涂上一种白色粘合料加以固定。从耳至足通高88厘米。昂首翘尾,左前肢提起,张嘴露齿作嘶鸣状。两耳直立,耳内涂朱。辱涂朱,上唇外残留有涂金痕迹,面具涂金。腹部丰满,臀部方圆,长肢,肘腋开豁,方膝,厚蹄,尾打结,这种分段铸造,镶接成形的铜马,在四川也曾出土过,但不多见。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条