1) power storage
发电库容
2) generation capacity
发电容量
1.
Optimization design of generation capacity adequacy based on integrated resource planning;
综合资源规划下发电容量充裕度的优化设计方法
2.
The adequacy analysis system of generation capacity in electricity market could be used to analyze the level of the generation capacity adequacy in electricity market, and provide the support to power system operation and investment.
电力市场发电容量充裕度分析系统可以用来分析电力市场环境下的发电容量充裕度水平, 为系统的运行和电力的投资提供支持。
3.
A dynamic simulation model was built to solve the setting of two key parameters,the energy price cap and the capacity price,in the generation market,and was then used to analyze the generation capacity development in various scenarios.
针对发电竞争市场中的两项关键参数——能量价格上限和容量价格的设置问题,研究提出了发电容量动态仿真模型,运用该模型对不同情形下的发电容量增长趋势进行了模拟仿真。
3) generation expansion
发电扩容
4) generator capacity
发电机容量
1.
This article sets forth the method of determination of the generator capacity on a 76 000 dwt bulk carrier by describing the electric load analysis.
从介绍76 000 dwt散货船的电力负荷估算书着手,阐述了确定该船发电机容量的方法。
5) capacitor trigger
电容触发器
6) net generating capacity
净发电容量
补充资料:库容
库容 reservoir capacity 水库某一水位以下或两水位之间的蓄水容积。表征水库规模的主要指标。通常均指坝前水位水平面以下的静库容。校核洪水位(关系水库安全的水位)以下的水库容积称总库容;校核洪水位与防洪限制水位(水库在汛期允许兴利蓄水的上限水位)间的水库容积称调洪库容,当汛期内防洪限制水位变化时,指校核洪水位与最低的防洪限制水位间的库容;防洪高水位(下游防护区遭遇设计洪水时,水库达到的最高洪水位)与防洪限制水位间的水库容积称防洪库容,当汛期内防洪限制水位变化时,指防洪高水位与最低的防洪限制水位间的库容;正常蓄水位与死水位(水库在正常运用情况下,允许消落到的最低水位)间的水库容积称兴利库容,又称调节库容,在正常运用情况下,其中的水可用于供水、灌溉、水力发电、航运等兴利用途;正常蓄水位与防洪限制水位之间的水库容积称重叠库容,是防洪库容或调洪库容与兴利库容之间的共用部分;死水位以下的水库容积称死库容,又称垫底库容,它不参加径流调节,只在战备、检修等特殊情况下才允许排放。库容值可由地形图量测计算,也可用地形法或断面法进行实地测量,再经计算获得。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条