说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 额定工况时的泄漏<液>
1)  running leakage
额定工况时的泄漏<液>
2)  rated condition
额定工况
1.
When design condition is different from the rated condition, it is necessary to check the capacity of the terminal unit under the design condition to ensure it is matched with the request.
设备设计工况与额定工况不同时,必须对设备的实际制冷能力进行校核,以保证实现设计目的。
2.
In air cooling fossil power plant,the meteorologic condition of the typical year is being used for the design and calculation of the are-cooling system with air temperature of less than 200 h operation in whole year,as for determination of basic condition for back pressure of steam turbine rated condition.
目前空冷火力发电厂的空冷系统的设计计算,系采用典型年的气象条件,以全年不满发200小时的气温,作为汽轮机额定工况的背压计算基准条件加以确定。
3)  non-full rated operating state
非额定工况
1.
It s a common situation for the industrial boiler with the super-heater in the non-full rated operating state, more and more attention is paid to the safety performance of the super-heater in this situation.
带有过热器的工业锅炉在非额定工况下运行是较常见的现象,由此引起的过热器运行安全方面的问题越来越受重视。
4)  man-hour quota
工时定额
1.
Establishment of man-hour quota for mould design based on analogism;
基于类推比较的模具设计工时定额制定方法研究
2.
The application of genetic neural network in calculating man-hour quota
遗传神经网络在工时定额计算中的应用
3.
A universal system of computer-aided man-hour quota,based on primitives theory,is proposed,in which man-hour quota is constituted according to the data obtained by work study method in workshop and the rule of man-hour variety is studied by neural network.
提出了一种基于基元理论,以工作研究法现场测定数据作为制定定额的依据,运用神经网络研究工时变化规律的通用化计算机辅助工时定额系统,在此基础上探讨了工时的分类划分,阐明了系统的体系结构和功能模块,最后介绍了系统的应用流程。
5)  Man-hour ration
工时定额
1.
Standard parameter database of man-hour calculation is set up and an applied software of man-hour ration management system is developed by integrating the application of mathematic model and computer query,taking Delphi and Access as develop tool,and ODBC as database interface.
采用数学模型与计算机查表综合应用的方法,以Delphi和Access数据库作为开发工具,ODBC为数据库接口,建立了工时计算标准参数数据库,开发出了实用的工时定额管理软件。
2.
The quality of man-hour ration management influences working-time, using ratio of equipment, cycle of production and reward, etc.
工时定额管理是企业的一项重要基础管理,是企业计划管理、经济核算、生产进度调控、成本控制、产品报价的重要依据,也是促进企业劳动生产率提高的重要手段。
6)  time quota
工时定额
1.
Research on Ration Predetermining Model in Computer Aided Time Quota Ration System Based on Primitives;
计算机辅助工时定额系统中的定额测算模型研究
2.
Study and Development on the Time Quota Module for Injection Mould CAPP System;
注塑模具CAPP系统工时定额模块的研究与开发
3.
Study and Development of Computer Aided System for Time Quota Management System Based on MODAPTS;
基于MODAPTS的计算机辅助工时定额管理系统研究与开发
补充资料:浓氯化钠注射液 ,高渗氯化钠注射液,高张氯化钠注射液
药物名称:浓氯化钠注射液

英文名:Injection 10% Sodium Chloride

别名:浓氯化钠注射液 ,高渗氯化钠注射液,高张氯化钠注射液
外文名: Injection 10% Sodium Chloride, Hypertonic saline
适应症: 用于脱水症及调节体内水与电解质的平衡。
用量用法: 静脉滴注,临用前稀释,用量与浓度视病情需要而定。
注意事项: 心、肾功能不全者慎用。
规格: 注射剂:1g/10ml,本品为氯化钠的高渗灭菌水溶液。



类别:调节水、电解质及酸碱平衡药
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条