1) electropyrexia
电发热法
2) heat cable method
发热电缆法
1.
In this paper,the calculation of the coulometry was presented, and some important indexes were discussed,it showed that the road deicing using heat cable method was of technical and economical feasibility.
发热电缆法作为彻底去除路面冰雪的一种方法,值得尝试推广。
3) Generating electricity by thermoelectricity
热电发电
1.
Generating electricity by thermoelectricity is a kind of efficient mode using terrestrial heat, solar energy, oceanic energy, surplus heat or deposed heat, which can convert the low potential energy into electricity.
热电发电是一种合理地利用地热、太阳能、海洋能及余热和废热等低势能转换为电能的有效方式。
4) thermal electron beam method
真空热电子发射法
1.
The work functions of the films were measured by thermal electron beam method.
采用真空热电子发射法测出了LaB6薄膜的逸出功。
5) in-situ conversion process technology
原位电法加热开发技术
1.
Physical principle and numerical analysis of oil shale development using in-situ conversion process technology;
针对目前国内传统地面干馏油页岩技术的缺点,并结合油页岩自身特性,介绍了一种新的油页岩开发技术——原位电法加热开发技术(ICP)。
6) electrothermotherapy
电热电法
补充资料:厂用电受电
厂用电受电
energizing of auxiliary power system
chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条