1) in-line assembly
成行装配
3) loading scheme
行包配装
4) tentative assembly
试行装配
5) assembly cost
装配成本
1.
Analyses detailedly a major factor on affecting assembling cost estimation precision in technology design stage,proposes the estimating model and system of raising estimating precision based on product structure tree on assembly cost,verifies that the estimating model is feasible by the example of product fleetness quoted price system of freight train.
详细分析了影响技术设计阶段装配成本估算精度的主要因素,提出了提高估算精度的基于产品结构树的装配成本估算模型和系统,通过铁路货车产品快速报价系统实例验证了这种估算模型的可行性。
2.
The estimating model of raising estimating precision was proposed based on the product structure tree on assembly cost through analysing the assemble cost in the technology design stage,the importance of estimating cost was verified in technology design stage by the example.
通过分析产品技术设计阶段的装配成本,提出了提高估算精度的基于产品结构树的装配成本估算模型,通过实例验证了在产品技术设计阶段对成本估算的重要性。
6) fitting assembly
装配总成
补充资料:成行
1.准备起行;动身。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条