您的位置:首页 -> 词典 -> 步进项目
1)  advance item
步进项目
2)  promotion of item
项目推进
3)  imported project
引进项目
1.
By analyzing and adjusting the power matching of every process of imported projects and studying the advanced experiences of the same trades,the quality guarantee system has been set up With high quality raw material and meticulous production,the monthly output of PC low relaxation steel strand has been as 1 9 times as that of the design Both producing and marketing are bris
通过对引进项目各工序能力匹配的分析和调整,并学习同行的先进经验,建立了质量保证体系,采用优质原料,精心组织生产,使低松弛PC钢绞线月产量达到设计能力的19倍,产销两旺。
4)  Project progress
项目进度
1.
Through the analysis on five influence factors of project progress, this article concludes six principles in the construction project progress control.
通过分析影响施工项目进度的5大因素,得出了施工项目进度控制的6方面原理。
5)  project schedule
项目进度
1.
Based on the implication and role of a project schedule and the analysis of unsolved problems, the GAHP model is used to determine the weight of evaluation indexes from four administrative levels, and the fuzzy comprehensive evaluation is utilized to evaluate a project.
在对项目及项目进度计划的含义、作用及存在的问题进行简要综合分析的基础上,运用群决策层次分析(GAHP),分4个层次来确定项目进度计划的评价指标权重,然后再运用模糊综合评价方法对项目进行评价,并将该方法应用于某工程制定项目计划的实际运作中。
2.
The core idea of project schedule management is that project must obey not local optimization but optimization on the whole.
项目进度制约因素管理的核心思想为"项目必须遵守整体优化而非局部优化",它主要运用关键链技术解决了资源冲突和不确定因素对项目进度的负面影响。
3.
By cases,this paper explains that this model can effectively shorten the project cycle and provide project schedule management with new thinkings.
论文通过实例说明了该模型可以有效地缩短项目周期,为项目进度管理提供了新的思路。
6)  reforming project
改进项目