1) cooling tower efficiency
凉水塔效率
2) cooling water tower
凉水塔
1.
Based on the comprehensive analysis for the working condition of cooling water tower, it was pointed out in this article that to carry out maintenance of the equipment in purpose and to change periodic maintenance to predictable maintenance can make cost decrease and make profit increase.
通过对凉水塔运行状况的综合分析,有目的地进行设备检修,使得定期检修或故障检修变为预测性检修,从而达到降本增效的目的。
2.
There have been some outstanding problems of circulating water management:hardware equipment in the circulating waterworks are old and aging,the bottom of the cooling water tower does not have evacuating equipment,so the mud cannot be drained.
循环水管理中存在的突出问题主要是循环水场硬件设施陈旧、老化 ,凉水塔排泥设施不完善 ,池底淤泥无法排掉 ;生产装置乱排乱放现象严重 ;一催冷 30 3/ 1- 30 3/ 4冷却效果差 ;气体分馏车间冷 10 8因循环水管层堵塞而冷却效果差。
3) cooling tower
凉水塔
1.
This paper analyzes thc reasons for the corrosion and permeation of reinforced concretefor cooling tower by circulation water and air in fertilizer plant,presents measures against the prob-lems.
分析了大化肥凉水塔钢筋混凝土结构受循环水及大气的腐蚀渗透原因,提出了防护方法。
2.
The main faults of DN-2500 cooling towers,such as blockage of sprinkling system,icing of packing and so on were briefly introduced,and the causes were analyzed.
简要介绍了DN-2500型凉水塔运行中出现的主要故障(淋水系统堵塞、填料结冰破碎等),并分析了故障原因。
5) open water-cooling tower
敞式凉水塔
6) Coling water tower fan
国产凉水塔风机
补充资料:凉水塔效率
分子式:
CAS号:
性质:指凉水塔操作时实际达到的水温降低值与理论上能达到的最大水温降低值之比。×100%,t2及t1分别为塔顶及塔底的水温,tw1为进入塔底的空气的湿球温度。当凉水塔传质段足够高时,效率η接近于100%。又t1-tw1差值代表实际出水温度与理论值之差。当效率愈高时,此差值愈小。
CAS号:
性质:指凉水塔操作时实际达到的水温降低值与理论上能达到的最大水温降低值之比。×100%,t2及t1分别为塔顶及塔底的水温,tw1为进入塔底的空气的湿球温度。当凉水塔传质段足够高时,效率η接近于100%。又t1-tw1差值代表实际出水温度与理论值之差。当效率愈高时,此差值愈小。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条