1) main shaft coal bin
主井煤仓
1.
To control the main shaft coal bin construction and construction period of Suntuan mine,realized the target of construction period s inverted.
通过对孙疃矿井主井煤仓施工过程与工期的控制创新,实现主井煤仓工期倒排的目标,从而为完成新井建设的其他关键工程,打下了坚实的基础,走出了新井建设的新思路。
2) shaft coal bunker
井下煤仓
1.
This paper analyzes the causes of the blockage of the shaft coal bunker,and puts forward some methods of treating the blockage of shaft coal bunker and some suggestions for the construction of preventing the blockage of shaft coal bunker.
分析了煤矿井下煤仓堵塞发生的原因,提出了煤仓堵塞的处理办法及防止煤仓堵塞的施工建议。
3) shaft coal pocket
井底煤仓
1.
This article briefly analysed the design of shaft coal pocket,and particularly expounded the impacts of design on construction.
在对井底煤仓设计简要分析的同时,着重从井底煤仓设计对施工的影响进行论述,并结合实例,对井底煤仓设计进行改进,力求施工工艺更趋简单,更符合实际使用要求。
4) main(oblique)coal bunker
主(斜)煤仓
5) underground coal banker engineering
井下煤仓工程
6) coal bunker
煤仓
1.
Discussion on rational millisecond time for sectional blasting of full depth of mine underground coal bunker;
井下煤仓全深度分段爆破合理微差时间的探讨
2.
The comparison of the two disposal schemes of coal bunker ground treatment with different ground conditions;
不同地基条件下选煤厂煤仓地基处理方案的比较
补充资料:白银有色金属公司深部铜矿主井和副井
白银有色金属公司深部铜矿主井和副井
白银有色金属公司深部铜矿主井和副井
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条