说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> PL19-3Ⅱ期海管项目
1)  PL 19-3Ⅱpipeline project
PL19-3Ⅱ期海管项目
2)  Project Management at Early Stage
项目前期管理
3)  project cycle management
项目周期管理
4)  PL 19-3 Ⅱ phase engineering
蓬莱19-3Ⅱ期工程
5)  oilfield PL19-3 in Bohai
渤海PL19-3油田
1.
The site of oilfield PL19-3 in Bohai is studied in this paper.
以渤海PL19-3油田工程场地为研究对象,利用钻探和剪切波速实测资料,根据中国规范GB50011-2001、美国规范FEMA-NEHRP和欧洲规范EC8,进行场地类别研究;通过地震动效应分析,得到海底表层软弱土对峰值加速度和反应谱的影响。
6)  overseas project
海外项目
1.
On early-stage management and key control of overseas project;
浅谈海外项目的前期管理及其关键控制
2.
Demobilization and mobilization of drilling rig of overseas project is complex system engineering, involving many departments and persons and information as well as hard organization and coordination.
海外项目钻机遣散和动员是一项复杂的系统工程,涉及的部门、人员和资料多,组织协调难度大。
3.
Through the analysis of overseas projects,the measures that should be adopted for the projects were put out,strengthening the management of the projects.
通过众多海外项目在劳务分包模式下的实施过程的分析,提出对海外项目所应采用的措施,以达到强化项目管理的目标。
补充资料:小海
小海 小海   经穴名。出《灵枢·本输》。属手太阳小肠经。合(土)穴。在肘内侧,当尺骨鹰嘴与肱骨内上髁之间凹陷处,屈肘取穴。一说在“天井外旁五分”(《针灸集成》)。布有前臂内侧皮神经分支及尺神经,尺侧上、下副动、静脉及尺侧返动、静脉。主治头痛,耳鸣,项强,颊肿,瘰疬,癫痫,肘臂痛等。直刺0.3-0.5寸。艾条灸5-10分钟。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条