1) district coal bin
采区煤仓
1.
Aiming at the serious damage of a district coal bin, a reasonable construction scheme was selected to repair the coal bin.
针对潘-矿东-采区煤仓损坏严重,修复难度大,工期紧的特点,合理选择方案,精心安排工序,采用顺序与平行作业相结合,成功地在规定检修期内完成煤仓修复和堵水任务。
2) remould about old coal bunke of mining area
采区旧煤仓改造
3) gateroad bunker
采区运输顺槽煤仓
4) mining area sump
采区水仓
1.
The mine slime water is from mining It should be dealed on spot of mining area sump and precipitating tank,then precipitated again by center sump and draw ground water out,so that the solidified amount of slime water will be reduced responsibly and the circumstance will be protected.
矿井煤泥水是采区生产过程中形成的 ,应在采区水仓及沉淀池就地处理 ,经中央水仓再次沉淀 ,排放地面水煤泥水的固体量相应减少 ,保护环
5) bin storage method
仓储采煤法
1.
Room arrangement of the bin storage method for Shangyi mine;
尚义煤矿仓储采煤法仓房布置研究
6) coal mining area
采煤矿区
1.
Study on groundwater vulnerability assessment in coal mining area;
采煤矿区地下水脆弱性评价
补充资料:标准煤(见煤当量)
标准煤(见煤当量)
standard coal
、~‘~1人、4《1工兀飞coal)见煤当等
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条