1) Stilling Basin Slope
消力塘边坡
1.
Analysis on the Water-rock Interaction of Stilling Basin Slope of Nuozhadu Hydropower Station;
糯扎渡水电站溢洪道消力塘边坡水岩作用机理研究
2) plunge pool
消力塘
1.
Safety analysis on bottom slab of plunge pool with key grooves
带键槽消力塘底板的安全性分析
2.
The plunge pool slope of a hydropower station in construction in Southwest of China is influenced by atomization-rain according to the forecast distribution of atomization-rain caused by spillway flood discharge.
根据西南某在建水电站溢洪道泄洪消能雨雾的分布预测,消力塘开挖边坡将受强烈的雾化作用影响。
3.
The Plunge pool of Xiaolangdi Multipurpose Dam Project is one of the biggest plunge pools among the world-wide hydroelectric projects.
小浪底水利枢纽工程消力塘的底板混凝土浇筑施工受工期延误的影响及安全渡汛的要求,必须及时调整原有分层浇筑的设计和施工方法。
4) plunge pool wier
消力塘尾堰
5) drainage water tunnel of plunge pool
消力塘排水洞
6) Lateral pressure of slope
边坡侧压力
补充资料:消力槛
消力槛
baffle sill
xiaolikan消力槛(b affle sin)设于泄水建筑物下游护坦末端的连续槛。其作用可以是蜜高护坦上水深,促使下泄水流在槛前形成底流式淹没水跃,也可以是将底部水流挑向水面,促进水流扩散,减少底部流速,削减下游侧边回流,使出池水流尽早恢复到河(渠)道的正常流速分布,缩短海漫长度。 消力槛可做成实体槛或齿形槛。实体槛断面一般为折线或曲线形实用堰,迎水面常采用直立面。试验表明,直立面对水流的反击力大,消能效果较为显著。齿形槛对水流的反击力小,其效果仅相当于合(高槛高度加低槛高度)的直立槛,但有助于槛后水流的横向和竖向扩散(见图)。 实体槛齿形槛 消力槛 消力槛水力计算的主要内容为确定槛高及槛的位置。在设计消力槛高度时应遵循以下原则:①槛前奎高的水深应满足在池中形成具有一定安全系数的淹没水跃;②过槛水流宜为淹没堰流。如过槛水流为自由溢流,应校核槛后水流衔接的流态,倘若出现远驱水跃,则需设置第二道消力槛或采取其他消能措施;③槛高应不影响建筑物的泄流能力。消力槛位置的确定,应使槛前所形成的清力池长度略大于或等于淹没水跃所需要的长度。 消力槛受水流顶冲,承受较大的水流冲击力,一般需采用钢筋混凝土结构,即使强度计算表明不需要受力钢筋,也应配置足够的构造钢筋,并与消力池底板内的钢筋可靠地连接在一起。(竺慧珠)