1) Sequence correlation
时序相关
2) sequential dependent segment
时序相关段
3) time sequence
时序
1.
Analysis and countermeasures against boiler MFT caused by improper time sequence;
时序问题引起锅炉MFT的分析与对策
2.
Under the same reheating conditions, the influence of time sequence of stretch and blowing (characterized with delay time t0) on the preform growth in stretch blow molding (SBM) was studied using a transparent mold and a digital camcorder.
在型坯再加热条件不变的情况下,通过全透明模具和数码摄像机研究了两步法拉伸吹塑中拉伸与吹气的时序(即预吹气延迟时间t0)对型坯拉伸吹胀模式的影响。
3.
In this paper, the action and time sequence of the multiple peg in hole are analyzed with an assembly machine.
多轴孔装配是一类实际和复杂的装配任务 ,本文根据设计的装配机分析了整个任务的装配动作及时序 ,并给出了任务控制布局图 。
4) timing
时序
1.
Startup process timing analysis of liquid bipropellant pressure-fed propulsion system;
双组元液体挤压推进系统启动过程时序分析
2.
Implementation of Parallel Extending Memory Based on Timing for AT89C2051;
基于时序的AT89C2051并行扩展存储器的实现
3.
Combining with the timing of strip elements spraying status calculation and setup values outputting in on-line feed-forward control,the timing of calculation and outpu.
结合国内某1450mm热轧带钢厂层流冷却系统的改造,介绍了过程级数学模型子系统的组成,主要包括进程的划分及激活逻辑、共享数据区的分类及数据流程,并结合实际在线前馈控制过程中样本集管组态计算和下发的时序,以及自适应后计算时序及自适应系数的数据流程,说明了数学模型子系统构成机制的合理性和运行结果的有效性。
5) time order
时序
1.
On The Time Order in The Narrationism and The Narrative Order in The Traditional Theory;
叙事学中的时序和传统理论中的叙述顺序
2.
Secondly, it is concluded through analyzing time order that simulating SPI operation using UART mode 0 is effective after proper data transformation.
接着经过时序分析得出 ,进行适当的数据排序变换 ,可用 U ART方式 0有效地模拟 SPI操作 。
3.
The paper puts forward a kind of photo electricity detector preposition videoplayer and time order gain control circuit,and narrates its work principle,device consideration and calculation.
设计了一种光电探测器前置视放及时序增益控制电路,给出了电路的工作原理、设计考虑及参数计算,解决了高灵敏与误测干扰的问
6) sequence
时序
1.
Since it is unsuitable for direct access by Digital Signal Processing(such as TMS320LF2407),a sequence conversion method is put forward by using Field Programmable Gate Array(FPGA),and the detailed process of operation is introduced in the paper.
为了实现DSP(如TMS320LF2407)对实时时钟芯片DS12887的访问,本文提出了用FPGA完成时序转换的方法,同时给出详细的操作过程。
2.
According to the charac- teristics of C8051F020 single-chip slicer and SED1335 controller,the reading-writing sequence of SED1335 lattice liquid crystal controller was analyzed,and the maximum frequency required by the sequence of SED1335 controller was calculated.
应用以MCS51系列单片机为内核的高速单片机C8051F020的I/O口,实现对SED1335点阵液晶控制器的控制;根据C8051F020单片机和SED1335控制器的相关功能特性,对SED1335点阵液晶控制器的读写控制时序进行了分析,计算出满足SED1335控制器时序要求的最高频率,论述了频率的修改方法,并按照读写控制时序和SED1335控制器的指令设计控制程序,给出对SED1335的命令编制子程序的方法和应用方法。
3.
Firstly, the role of sequence in circuits was discussed.
讨论了电路设计中常见的时序问题,指出电路设计的关键问题是"时序配合"问题。
参考词条
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。