1) a sequential quadratically Consteained quadratic programming method
序列二次约束二次规划方法
3) sequential quadratic programming
序列二次规划方法
1.
In the first level,the ge-netic algorithm is employed to determine the optimal positions of docking blocks while the sequential quadratic programming is utilized to obtain the optimal dimensions of docking blocks in the second level.
本文建立了船舶坐墩墩木布局及尺寸优化设计的数学模型,用分级优化方法来求解,其中,外层采用遗传算法确定墩木最佳位置,内层采用序列二次规划方法确定墩木最佳尺寸。
4) SQP
序列二次规划法
1.
IPACA only models the discrete control variables to reduce the calculation time,and use Sequential Quadratic Programming(SQP) to solves the state variables and the continuous control variables.
新算法只考虑离散变量,以降低计算时间,同时使用序列二次规划法求解连续变量。
2.
Based on the fitting results and its inner law,the calculating efficiency in optimizing the reactor is increased via applying the sequential quadratic programming(SQP) method.
基于其内部规律,结合拟合结果,应用序列二次规划法(SQP)对电抗器进行优化,提高了优化计算效率。
5) sequential quadratic programming(SQP)
序列二次规划法
1.
In this paper,the major members,web members,and their cross-section sizes are optimized in Matlab using sequential quadratic programming(SQP) method.
抱杆设计时,选用抱杆质量为目标函数,以满足设计容许中心压力为约束条件,对抱杆的主材、斜材和断面尺寸进行综合优化,利用序列二次规划法在Matlab软件上进行计算。
2.
For the purpose of discovering the near-globally optimal solution,this paper proposed a hybrid approach of ant colony algorithm and sequential quadratic programming(SQP).
在此求解过程中,以每只人工蚂蚁来表示符合限制条件的某个可运转状态的发电机组合并以序列二次规划法来求解传统的经济调度问题。
3.
The sequential quadratic programming(SQP) method for nonlinear constraint problem is applied for the segmented primary mirror cophasing control.
研究采用一种求解非线性约束问题的序列二次规划法优化求解主镜致动器的位移控制指令,校正分块式主镜相位误差。
6) sequential quadratic programming algorithm
序列二次规划法
1.
The sequential quadratic programming algorithm of optimization toolbox of MATLAB is effectively used to solve the model after it is concisely introd.
在简要介绍MATLAB优化工具箱中的序列二次规划法后,采用该算法求出设计结果。
2.
Then,the sequential quadratic programming algorithm of optimization toolbox of MATLAB that is better than the penalty functi.
研究了以单级斜齿圆柱齿轮减速器的体积最小为目标函数,应用可靠性设计理论和现代优化技术建立其可靠性优化设计模型的方法,结合工程实例建立减速器的优化设计模型,采用MATLAB优化工具箱中比惩罚函数法更优的序列二次规划法求解。
补充资料:二次线施工
二次线施工
installation of secondary and control wiring
erClxlon shlgong二次线施工(installation of seeondary andeontrol wiring)二次线系指控制室、开关室的各盘、柜及就地盘之间的盘间联络线,控制室与热工控制用的调节控制装t和操作机构间的连线等。二次线施工系指将电气设备的操作、测量、保护、信号、自动控制及调节等回路中的元件,按照图纸连接成互相关连并能执行对一次设备的工况进行监测和控制的完整通路的工作。二次线施工工序有:图纸核对、电缆接线及检查试验等。 圈纸核对二次线图纸包括原理接线图,盘、柜的端子排图,盘面布t图及电缆清册等,分别由设计院及制造厂提供.有时复杂回路的设备由几家制造厂供货,图纸中的图形及文字符号的表示不尽一致,电缆的连接路线与实物核对可能有重复、漏项和走向不合理,所以开工前需先将有关图纸根据原理图逐一核对,发现问题及早解决,避免造成返工和浪费。 电统接线分电缆头制作、校线及排线接线三步。校线依线芯的绝缘分色或绝缘层上的号码确定两端的线芯编号,也可用校线器或电池灯校对,然后按照端子排图纸上的顺序号,将线芯套上标志头后接在端子排上;对多股线芯还需压接接线鼻子。 二次回路检查试脸分通电前试验和通电后试验。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条