2) underground water resource calculation
地下水资源计算
1.
This paper makes a retrospect and perspective of major problems in underground water resource calculation,which is usually affected by many factors including both theoretical factors and practical factors.
对影响地下水资源计算的主要问题作了回顾与展望。
3) computing resource
计算资源
1.
Load prediction of grid computing resources based on ARSVR method
基于ARSVR方法的网格计算资源负载预测(英文)
2.
Feedback scheduling of computing resources based on support vector machines
基于支持向量机的计算资源反馈调度
3.
Though the analysis of the characteristics of CFD jobs,user computing resource and commercial job schedule system,a job schedule system which achieves the remote-computing in shared directory has been made.
针对目前CFD行业中计算作业的特点、用户计算资源状况和使用特点,以及对现有相关作业调度系统的分析研究,设计出采用共享目录方式进行远程计算的作业调度系统。
4) computational resource
计算资源
1.
To solve the problems of insufficiency of collaborative interactive work, shortage of computational resources, difficulty in dynamical resources scheduling and restrictions to the system scale in multi-user collaborative visual assembly simulation during complex product designing process, a collaborative virtual assembly grid(CVAG) scheme based on grid architecture is proposed.
针对复杂产品协同虚拟装配仿真应用中存在的协同交互能力差、计算资源短缺、资源动态调度分配难、规模易受限制等问题,提出了一种借鉴网格体系结构的多用户协同虚拟装配网格平台方案,介绍了系统中仿真计算资源的类型及功能,进而提出了面向服务的仿真计算资源服务化封装方法,同时还给出了系统资源管理、任务管理与调度等部分关键技术的解决方案。
5) Computing model for groundwater resources
地下水资源计算模型
6) Computation and Evaluation of Water Resources
水资源计算与评价
补充资料:地下水水资源评价(见水资源评价)
地下水水资源评价(见水资源评价)
d ixiashui shuiziyuan Ping】ia地下水水资源评价见水资源评价。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条