1) Rockfill materials used in face dam
面板坝堆石料
2) concrete face rockfill dam
面板堆石坝
1.
Study on creep mechanism and long-term deformation prediction for high concrete face rockfill dam;
高混凝土面板堆石坝流变机理及长期变形预测
2.
New concept of design for high concrete face rockfill dams;
高混凝土面板堆石坝设计理念探讨
3.
Discussion on arrangement of monitoring instruments at concrete face rockfill dams;
关于混凝土面板堆石坝监测仪器布置的探讨
3) CFRD
面板堆石坝
1.
New Engineering Construction Technology of CFRD Performed in Gongbo Gorges of Yellow Rive;
黄河公伯峡面板堆石坝工程施工新技术的应用
2.
Dynamic response analysis of CFRD with extrusion-sidewall structure;
采用挤压式边墙结构的面板堆石坝的动力反应分析
3.
Statistical Analysis for the Settlement Monitoring Data of Baixi CFRD;
白溪面板堆石坝沉降监测资料统计分析
4) concrete facing rockfill dam
面板堆石坝
1.
Analysis and treatment of the crack causes of concrete facing rockfill dam of the Nanche Reservoir;
南车水库混凝土面板堆石坝面板裂缝成因分析及处理
2.
Study on and application of new sealing structure in the peripheral joints of Qinshan concrete facing rockfill dam;
芹山面板堆石坝周边缝新型止水结构研究与应用
3.
Application of natural diluvial deposit in the bedding materials of concrete facing rockfill dam;
天然洪积堆积物在面板堆石坝垫层料中的应用
5) concrete faced rockfill dam
面板堆石坝
1.
Dam deformation control of concrete faced rockfill dam of Sanbanxi Hydropower Project;
三板溪面板堆石坝坝体变形控制
2.
Comparison of computational results of different dynamic analysis methods for concrete faced rockfill dam;
面板堆石坝动力分析方法比较研究
3.
Comparative research on frequency spectrum of concrete faced rockfill dam of different height;
不同高度面板堆石坝幅频反应的比较研究
6) face rockfill dam
面板堆石坝
1.
Study on the GPS real-time supervisory system alternatives of filling quality of concrete face rockfill dam;
面板堆石坝填筑施工质量GPS实时监控系统方案研究
2.
Analysis on the prototype observation data of Wan anxi concrete face rockfill dam;
万安溪面板堆石坝原型观测资料分析
3.
For this reason,the owner of Shuibuya hydropower station puts forward the quality supervisory system of filling and rolling in the contruction of concrete face rockfill dam,and applies it to the practice of the project eventually through the procedure of system development,field test and trial run,and obtains better result.
为此,建设单位在水布垭水电站混凝土面板堆石坝工程建设中,提出了大坝填筑碾压施工质量监控系统,并通过系统研制、现场试验、试运行等环节,最终应用于工程实际,取得了较好的效果,扼要介绍了该系统的研究、应用情况,提出了应注意的问题。
补充资料:钢筋混凝土面板坝
钢筋混凝土面板坝
earth-rock dam with reinforced concrete facing
gangiin hunnjngtu mianbanba钢筋混凝土面板坝(earth一roek damwith reinforeed eonerete faei叮)用铺筑在上游边坡上的钢筋混凝土板作为防渗盖面的土石坝。下游坝壳多用堆石填筑,堆石体边坡的确定见堆石坝、坝坡稳定。 在20世纪4。年代以前,已建造有钢筋混凝土斜墙堆石坝,如美国在1924年修建了高83.9米的狄克斯河坝等。但当时均采用抛石填筑坝体,很不密实,沉陷、位移量大。即使采用了较厚的钢筋混凝土斜墙,仍造成严重裂缝和大量漏水。至20世纪50年代后期,一些国家采用了振动碾碾压堆石的施工方法。坝体密实度高,孔隙率为20一25%.坝体干容重一般大于2.0吨/米”.沉陷、位移量小。即使采用很薄的钢筋混凝土面板防渗亦很少出现裂缝。如1980年巴西建成的高160米的佛士度爱利坝及1971年澳大利亚建成的高110米的塞沙纳坝(图1)等都很成功。至今世界上已修建这类坝轴线护网及锚着钢筋图l塞沙纳混凝土面板堆石坝坝高度在50米以上者达70余座,坝高在100米以上者有18座。中国在20世纪60、70年代也修建了几座钢筋混到2)凝土斜墙堆石坝。如三渡溪坝、南山坝及百花坝(等1 156。(}甲~图2百花堆石坝i设于t体都较沥;经分:的影一但这i板伸{土底、的要).3十{筋率!伸缩!设置兰查廊 钢筋棍凝土面板坝的主要优点为:防渗面枉堆石体的上游面.不仅兼有护坡作用,且整个为是受力结构,稳定性好;坝坡一般为1:1 .3左右青面板坝常用的1:1 .7更陡,工程量省,堆石填澎层碾压后不仅沉陷量小,且不受面板施工及雨多响、一在抗震性能方面,优于上质防渗的堆石坝二种坝型必须用重型振动碾将堆石体碾压密实;正缩缝止水片须仔细埋设;面板与基础连接的混凑座,要做好基础处理及帷幕灌浆。 钢筋混凝土面板的厚度e,考虑防渗和耐夕求,顶部一般为0.3米,其下随水头H增加为:e二(0 .002一0.003)H(米),一般不作结构计算,两两向各为0.4一0.6%,并且设置从顶到底的竖作缝,间距12一18米。面板周边与混凝土基座之详伸缩缝止水片。有些重要工程还在基座内设置书道。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条