1) Large formwork system
大型模板体系
2) large integral steel formwork
大型整体钢模板
1.
As the construction schedule was very tight and high quality exterior appearance was requested,large integral steel formwork was adopted for the works and satisfactory results have been achieved.
32#、31#泊位地连墙之上的前胸墙共有40段墙身组成,为统一的异型断面,设计要求一次浇注成型不留施工缝且该工程施工进度紧迫,外观要求质量高,为此在施工中采用了大型整体钢模板施工技术并收到了良好的效果。
3) Large-area formwork Top50
Top50大墙模板体系
5) formwork system
模板体系
1.
Optimization of formwork system of cast-in-place concrete for major structure of high-rise building;
高层建筑主体结构现浇混凝土模板体系的选择
2.
In this article,authors show the construction process of inclined beams,especially the formwork system and construction methods.
本文总结了斜梁的施工过程,重点介绍斜梁模板体系及施工方法。
3.
Integral steel platform formwork system is a new kind of formwork system adapting the construction need of super high rise buildings.
整体钢平台模板体系是适应超高层建筑主体施工需要的新型模板体系,通过建立有限元模型,对整体钢平台模板体系的动力特性进行了详细分析,得到了其自振频率和振型,其相关结论可以为模板体系的设计和施工借鉴。
6) follow board system
模板体系
1.
Key points in the design of the high strut follow board system;
高支撑模板体系设计重点考虑的因素
2.
It analyzes the characteristics and application dimension of every follow board system,represents the design idea of compound plastic inside lining follow board,discusses its composition and construction technique,and generalizes the related matters need attention in application,which will meet the purpose of increasing the integral firmness of structure.
分析了各种模板体系的特点及应用范围,阐述了塑料复合内衬模板的设计构想,论述了其组成以及施工工艺,总结了应用中的有关注意事项,达到提高结构整体耐久性的目的。
补充资料:鞍山钢铁(集团)公司大型轧钢厂大型轧机热轧型钢
鞍山钢铁(集团)公司大型轧钢厂大型轧机热轧型钢
鞍山钢铁(集团)公司大型轧钢厂大型轧机热轧型钢
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条