说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 单机单跨整体吊装
1)  The single machine is single to across the whole mourn to pack
单机单跨整体吊装
2)  single crane hoisting
单机吊装
3)  single span suspension bridge
单跨吊桥
1.
The influencing factors of the single span suspension bridges are obtaine
根据有限元理论,借助通用有限元程序,对单跨吊桥的结构性能进行了空间非线性分析,并依此得出了有关影响单跨吊桥结构刚度的因素。
4)  integral hoisting
整体吊装
1.
The techniques of integral hoisting of the super steel cofferdam is adopted in No.
苏通大桥主桥6、7、8号墩的特大型钢吊箱采用整体吊装施工工艺。
2.
The selection and integral hoisting of water tower with large capacity are also discussed.
对8度震区内800m3倒锥壳保温水塔的受力特点和抗震设计进行了比较详细的分析,提出了支承筒与水柜间先进简捷的连接方式,从而增加了水塔的有效容积,缩小了水柜直径,节省投资,并对大容积水塔的选型和整体吊装施工工艺进行了剖析和探讨。
3.
Solutions were adopted aiming to several characteristics including accurate location of construction steel box, integral hoisting (with 190 t total weight) and difficult organization.
介绍了针对施工钢套箱准确就位、钢套箱整体吊装(总重量为190t)和施工组织难度大等特点采取的应对措施。
5)  integral lifting
整体吊装
1.
Method and characteristics of integral lifting of axial flow Kaplan runners;
轴流转桨式水轮机转轮整体吊装的方法和特点
2.
On the integral lifting construction technique of the arch leaf for the concrete filled steel tube's arch
钢管混凝土拱桥拱片整体吊装施工技术
3.
The construction technique for high altitude integral lifting of large front support point form travelers by use of simple horizontal hanger frame is introduced,through comparison of construction technique of large form travelers of two cable-stayed bridges(Chongqing Fengjie Yangtse River Bridge and Pengxi River Bridge on Chongqing Yunwan Expressway).
通过重庆奉节长江大桥及重庆云万高速公路彭溪河特大桥两座斜拉桥挂篮吊装施工的对比,主要介绍了利用简易水平吊架进行大型前支点挂篮高空整体吊装的施工技术。
6)  integral lifting and installation
整体吊装
1.
This paper introduces the construction scheme adopted for the integral lifting and installation of guyed form traveler for the main girder atop pier No.
介绍忠县长江公路大桥11号墩主梁牵索挂篮采用的整体吊装施工方案。
2.
0,the rest parts of the girder of the bridge are constructed by the front-support form travelers and the construction technology for the integral lifting and installation of the travelers is presented.
丰城剑邑大桥主桥为(55+2×165+55)m单塔双索面斜拉桥与悬臂梁桥协作体系结构,除0号块前3段梁段外,其余梁段采用前支点挂篮施工,介绍挂篮整体吊装施工工艺。
补充资料:硫酸尾气塔整体吊装


硫酸尾气塔整体吊装


  凶 硫酸尾气塔整体吊装
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条