1)  Chaohe Major Dam
潮河主坝
1.
From August 1998 to October 2001, the reinforcement of the Chaohe Major Dam was conducted.
1998年8月至2001年10月,进行潮河主坝安全加固工程。
2)  earth dam of Husonghe power station
户宋河电站主坝
1.
The mathematical statistics is applied to analyze the quality indexes of earth filling in the four zones, which are L-shaped drainage body, upstream dam, downstream dam and contact clay, of the earth dam of Husonghe power station.
采用数理统计方法,对户宋河电站主坝的L 型排水体、上游坝体、下游坝体、接触粘土四个分区的填筑质量的检测指标进行统计分析。
3)  river dike
河坝
4)  Chaohe river
潮河
1.
Administrable Measure and the Effect Evaluation of Eco-Restoration for Chaohe River
潮河生态修复治理措施及效果分析
2.
The main reason of water population was: no-point pollution was serious caused by soil and water loss in upper reaches of Chaohe river;the amount of entering wa.
依据水质自动监测系统数据,对密云水库重要入库支流-潮河古北口省界断面水质变化趋势、水质特性等进行了详细讨论与分析。
5)  tidal gate & dam
感潮闸坝
1.
Based on analyzing key points and methods of integrated intelligent dispatching for tidal gate & dam,the article is taking the example of actual application of Beixi sluice gate on Jiulong River in Fujian to make a research study on contents,main technological methods of integrated intelligent dispatching for tidal gate & dam.
感潮闸坝主要用于调节入江、入海的下泄流量,控制闸坝前水位,实现防汛抗旱及水资源管理等目的。
6)  main dam
主坝
1.
Safety evaluation on clay core of main dam in Wuchuan reservoir;
乌川水库粘土心墙主坝的安全性评估
2.
Design of connecting block for main dam and auxiliary dam in Nierji reservoir;
尼尔基主坝 副坝等连接段的设计
3.
Treatment for foundation seepage in main dam of Dashankou Dam;
大山口大坝主坝基础渗漏的工程处理