说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 无功平衡计划
1)  reactive power balance planning
无功平衡计划
2)  reactive power balance
无功平衡
1.
Based on basic data of reactive compensation in Beijing-Tianjin-Tangshan Grid in 2008 and power system operation in 2007,reactive power balance in summer of 2008 was analyzed.
根据京津唐电网2008年无功补偿的基本数据及2007年的运行情况,对2008年夏季无功平衡情况进行了分析,针对保证奥运会供电电压质量的重点、难点提出措施和要求。
2.
Dased on the analysis of reactive power balance and voltage control of Beijing-Tianjin-Tangshan Power Network in 2006,problems existed in power network operation are found out,and suggestions and corresponding measures are put forward.
在对2006年京津唐电网电压水平和无功平衡情况进行分析的基础上,找出了电网运行中存在的问题,并提出了相应的建议和措施。
3.
The selection of the equipment for generating the reactive power needed in the system has a direct effect on the way of the reactive power balance, which is closely related to profits.
无功功率的平衡调节,是电力系统运行的重要环节,而无功生产设备的选择与应用,直接影响无功平衡方式和经济效益。
3)  reactive balance
无功平衡
1.
The power supply scheme of power grid,the reactive configuration and the operation of reactive power flow are analyzed after the old units in Jiangyou Power Plant are shutdown,and the technical measures and control measures are proposed to solve the reactive balance.
对江油电厂老机组关停后的电网供电方案、无功配置情况和无功潮流运行情况进行了分析,提出解决无功平衡问题的技术措施和管理措施。
2.
Studies have been done to power active and reactive balance through calcultion,solutions are presented in regarding to the power restricting and the supply necessary reference to the program development of yuncheng power Network.
通过计算 ,从有功平衡和无功平衡两个方面对运城电网进行了分析研究 ,并针对运城电网的限电原因提出了具体的解决方案 ,为运城电网以后的规划发展提供了有益的参考依据。
3.
The possible problems regarding reactive balance and voltage level under various operation modes of corresponding power grids when Yangcheng-Jiangsu transmission project put into operation in 2000 are studied using PSS/E program and thus a theoretical computation basis for working out safe and reliable operaton moades of power grid is presented.
对阳城送电工程 2 0 0 0年投产项目 ,应用 PSS/E程序 ,通过大量计算和分析研究相关网络各种可能出现运行方式下的无功平衡与电压水平问题。
4)  Balance Program
平衡计划
5)  Plan Balancing
计划平衡
6)  daily reactive power scheduling
日无功计划
1.
A mathematical model is proposed for daily reactive power scheduling for the demand of management of reactive power and voltage.
根据实际无功电压管理工作的需要,建立了日无功计划数学模型。
补充资料:计划综合平衡

计划综合平衡:是编制计划的基本方法。综合平衡就是对全社会的人力、物力、财力进行统一协调,合理安排,从总体上求得社会生产和社会需要之间的平衡,使社会生产能大体按比例地协调发展。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条