1) cooling-bed system
冷床系统
1.
The paper accounts the project shortages from the cooling-bed system of No.
叙述了武钢“平改转”工程1号大方坯连铸机出坯冷床系统设计缺陷,围绕冷床从理论和实际两个方面进行了设计缺陷的分析,结合生产实际,从安全以及经济角度对设计缺陷进行了改进,实现了1号5×5大方坯连铸机安全、稳定地连铸生产。
2) hydraulic pressure of cooling bed
冷床液压系统
3) feeding steel system of cooling bed
冷床送钢系统
5) regenerative rockbed cooling system
再生式岩床供冷系统<能>
6) pond-bed system
塘床系统
1.
Application of oxidation pond and man-made wetland pond-bed system to treatment of paper-making wastewater;
氧化塘-人工湿地塘床系统处理造纸废水应用研究
2.
In the constructed wetland pond-bed system in Living Water Garden at Chengdu,the removal rates of COD,BOD,T-N,T-P,oil,LAS,Ar-OH,NH 3 and S 2- are more than 85% and for total coliforms is more than 99 9%,in which purification efficiency can be qualified for purifying polluted surface water or doing tertiary treatment So the constructed wetland pond-bed system is an ecological filte
成都市活水公园人工湿地塘床系统对枯水期府河水中的CODCr,BOD5,TN ,TP ,oil,LAS ,Ar -OH ,NH3,S2 - 等污染物的去除率在 85%以上 ,总大肠菌群的去除率达 99 9%以上 ,其净化效果能够满足净化地表水或污水深度处理的需要。
补充资料:棒材步进式冷床(新沪钢厂)
棒材步进式冷床(新沪钢厂)
棒材步进式冷床(新沪钢厂)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条