1) gap between pile top and raft
预留净空
1.
Piled raft with gap between pile top and raft to adjust differential settlement;
用于调整差异沉降的预留净空桩筏基础模型试验研究
3) the piled raft with gap between pile top and cap
桩顶预留净空桩基础
4) piled raft with gap between pile top and raft
桩顶预留净空桩筏基础
1.
Field model tests are performed on the rigid pile composite ground(RPCD),the conventional piled raft(CPR) and the piled raft with gap between pile top and raft(PRGPR) to study the raft-pile-soil interaction with different structural connection forms between the pile top and the raft.
针对桩顶与筏板之间不同构造形式下的相互作用,对可压密土中刚性桩复合地基、常规桩筏基础和桩顶预留净空桩筏基础进行了现场模型试验,测量了筏板沉降、筏板内外不同深度地基土沉降、桩身轴力和桩间土反力,分析了不同荷载级别下筏板沉降、筏板内外不同深度地基土沉降、桩土荷载传递特性和桩土荷载分担比分布规律。
5) space to be preserved
空间预留
6) reserved empty roadway
预留空巷
1.
In the light of the geological conditions of tailing-in of reserved empty roadway in 72803 fully-mechanized working face of Nanbapan District, this paper introduces the support method and adopted measures for reserved empty roadway working face, and analyzes its economic benefit.
针对南八盘区72803综采工作面预留空巷收尾的地质条件,介绍了预留空巷工作面支护方式和采取的措施,分析了其经济效益。
补充资料:飞机场净空区
见飞机场附近障碍物限制。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条