1) Enterprise Overall Risk Warning
企业全面风险预警
2) overall risk of enterprise management
企业全面风险管理
1.
This paper,by way of explanation of enterprise risk and overall risk of enterprise management,describes relation between enterprise risk factor and enterprise organizational structure management,as well as the introduction of relationship between enterprise risk management department and other departments inside the enterprise.
本文通过对企业风险、企业全面风险管理的阐述,企业风险因素与企业组织结构管理之间的关联性的描述,以及企业风险管理部门与企业内其他部门的关系介绍,指出当前电力企业的风险管理意识暂时停留在危机管理的意识状态上,提出变革时期的电力行业,影响企业战略制定最主要的风险因素是来自于企业外部的政策、环境风险。
3) Early Warning of Unemployment Risk
失业风险预警
4) risk pre-warning
风险预警
1.
On agential channel risk pre-warning of mobile operators
移动运营商社会渠道风险预警研究
2.
The paper analyzes the risk pre-warning of supply chain and port supply chain,establishes a risk pre-warning index system of port supply chain based on SCOR model and statistic data,sets up a double-factor evaluation model based on Hallikas supply chain risk double-factor framework and shows a actual case.
首先分析了供应链风险预警和港口供应链问题,并以SCOR模型为基础结合统计实证构建了港口供应链的风险预警指标体系,并基于Hallikas的供应链风险双因素框架建立了双因素评估模型,最后就青岛港前港公司矿石供应链进行了实证检验,得出其供应链风险等级状况。
5) risk early warning
风险预警
1.
The Risk Early Warning on Investment of R&D Human Capital in Software Enterprises;
软件企业R&D人力资本投资风险预警研究
2.
In terms of project risk management and on the basis of the theory and method of cement concrete pavement reliability design,the uncertain factors in the process of cement concrete pavement design are systematically analyzed,the index system of cement concrete pavement design risk is established,the risk early warning index,its threashold value and relevant risk early warning signal are defined.
从工程项目风险管理的角度出发,结合水泥混凝土路面可靠度设计的理论和方法,系统地分析了水泥混凝土路面设计中存在的不确定性因素,建立了水泥混凝土路面设计风险指标体系,确定了水泥混凝土路面设计风险预警指标及其阀值和相应的风险预警信号。
3.
The risk prediction model is very critical and regarded as the core part of the risk early warning system.
以人工智能的思想为指导,将SOM与PNN网络相结合,提出并建立了一种基于SOM-PNN的信贷风险预警模型;结合统计理论方法对输入样本进行预处理,解决了网络训练中样本选用的问题;并利用因素分析方法对预警结果进行了解释。
6) risk warning
风险预警
1.
A Study on Risk Warning of Logistic Industry Based on the Customer Value;
基于顾客价值的物流企业风险预警研究
2.
In the light of the characteristics of group customer credit-committing business risk, commercial banks are required to strengthen organizational building and enhance information management as well as risk warning.
针对集团客户授信业务风险的特点,商业银行要加强组织建设,加强信息管理和风险预警,制定对集团企业统一授信可操作性的方法,加强贷后管理,加强监管力度。
3.
Based on the abovementioned analysis,road traffic security risk warning system is established,thus the area and period of road traffic security risk warning are confirmed.
应用风险识别技术,按照三类危险源的分类方法确定道路交通安全风险的致灾因素,并对致灾因素的致害情况进行分析,在此基础上建立道路交通安全风险预警体系,可由此确定道路交通安全风险预警的范围及周期。
补充资料:施工企业全面质量管理
施工企业全面质量管理
total quality control in the construction enterprise
Shigong qi归quanmian zhiliang guanli施工企业全面质t管理(total quality con-trol in the eonstruetion enterPrise)施工企业全体职工及各部门,综合运用管理技术、专业技术和科学方法,建立起从工程投标、建筑安装、竣工服务等活动全过程的质量体系,保证生产出用户满意的建筑产品的管理活动。 沿革质量管理的发展,大体经厉了质量检验阶段、统计质量控制阶段和全面质量管理阶段。 (1)质量检验阶段。从20世纪20年代到40年代。该阶段的质量管理主要靠后阶段检验把关,从大量产品中剔除废品。 (2)统计质量控制阶段。从20世纪40年代到50年代。该阶段的质量管理主要采取检查与预防相结合,用数理统计方法分析施工中可能影响质量的因素和环节,并进行控制和协调。 (3)全面质量管理阶段。在20世纪60年代初,美国的费根堡姆(A.V.Feigenbaum)首先提出全面质量管理概念.日本继美国之后又有新的发展.全面质量管理在20世纪70年代后期传人中国,1979年,冶金施工企业开始推行这一科学方法,建立健全了质量体系,加强了质量体系认证,使工程质量、建设速度、企业素质和经济效益都得到显著提高。 与全面质量管理相对应,习惯称20世纪60年代以前的质量管理为传统质量管理。全面质量管理与传统质量管理的对比见表。 指导思想包括为用户服务的思想,预防为主的思想,用事实与数据说话的思想,系统控制的思想,突出质量的经营思想。 (1)为用户服务的思想。施工企业为用户服务,突出表现在施工前为用户着想,施工中对用户负责,施工后让用户满意,做好回访用户工作;还体现在企业内部,经营管理者要把工作对象看作是用户,后勤服务者要把服务对象看作是用户,施工岗位的工人要把下道工序看作是用户,满足用户要求,不断提高自己的工作质量。 (2)预防为主的思想。事先分析影响工程质量的各种因素,找出关键环节,采取措施,加以重点控制,由管结果变为管因素,由事后检验把关变为事先预防控制。全面质t管理与传统质t管理对比表十 特别是做好施工前期准备,实行超前管理和早期报警,做到防患于未然。 (3)用事实与数据说话的思想。坚持实事求是,以客观事实为依据反映、分析、解决质量问题,掌握质量运动规律。质量管理工作尽可能做到数据化,通过计量、评分、评等级、排顺序等,改定性管理为定量管理。 (4)系统控制的思想。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条