说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 磨子潭一号大桥
1)  MoZiTan First River Bridge
磨子潭一号大桥
1.
Analysis of Construction Control for MoZiTan First River Bridge;
磨子潭一号大桥的施工控制研究
2)  Mozi Pond
磨子潭
1.
In this paper, with the model test of discharging flood hole depression of Mozi Pond Reservoir, the reason produced the discharging flood tunnel cavitation and cavitation corrosion was analyzed and discussed.
本文结合磨子潭水库泄洪洞减压模型试验,对泄洪洞空化、空蚀产生的原因进行分析与探讨,并结合工程的实际情况,提出改建方案与措施,以消除泄洪洞空化、空蚀现象,确保泄洪洞运行安全。
3)  the Fourth Bridge in Xiangtan
湘潭四大桥
4)  Longtan River Bridge
龙潭河大桥
1.
Time Domain Analysis of Wind-Induced Buffeting of Longtan River Bridge;
龙潭河大桥风致抖振时域分析
5)  Shitanxi bridge
石潭溪大桥
6)  Mozitan Fault
磨子潭断裂
1.
The various boundary relationship,inclusions and petrochemistry of the undivided parts of the Dabieotoup in the Zhawang area of Shucheng,Anhui indicate that the perts are in eality the Yensharuan Ⅰ-type(Caledonian) granotoids rising along the Mozitan Fault.
通过对安徽舒城查湾地区“大别群未分部分”的各种界面关系、包体特征及岩石化学等的观察研究,发现该“部分”实属燕山期沿磨子潭断裂上侵的Ⅰ型加里东期花岗岩类,并认为这一事实的区域地质意义有:岩体侵入前的磨子潭断裂可能沿125°方向延至官庄,查湾岩体可能为目前“大别群”与“芦镇关群”①的界线。
补充资料:531鹰潭号

排水量:标准1565吨,满载1960吨

主尺度:长103.22米,宽10.8米,吃水3.05米

动 力:2台12e390va型中速柴油机,功率2×8000马力

4套16pa6v280btc型柴油发电机组,双桨双舵

航 速:25.5节

续航力:4000海里/18节,自持力15昼夜

航 程:7200公里

编 制:200人(其中军官30人)

武 器:2座双联装sy-1a舰对舰导弹

2座79式(712型)100mm双联半自动舰炮

4座76式(715型)37mm双联半自动舰炮

2座81型1200火箭式深弹5管发射器(备弹40枚)

4座64式大型深弹发射炮

2座深弹投放架

2条布雷轨道(最大携雷量24枚)

待定

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条