1) Relevance Calculating Model
![点击朗读](/dictall/images/read.gif)
相关度计算模型
2) similarity mode
![点击朗读](/dictall/images/read.gif)
相似度计算模型
1.
This paper discesses the application of the Hungarian algorithm in the similarity mode on students answer and standard answer of automated assessment technology of subjective tests,and it s carried on the improvement from the both sides.
针对主观题自动批阅中的学生答案和标准答案中对应句子的相似度计算问题,提出采用最优指派问题的匈牙利算法,并从两方面对其进行改进,进而建立基于匈牙利改进算法的句子相似度计算模型。
5) topic relatedness evaluation
![点击朗读](/dictall/images/read.gif)
主题相关度计算
6) CIM
![点击朗读](/dictall/images/read.gif)
计算无关模型
1.
The models of MDA, including CIM (Computing Independent Model), PIM (Platform Independent Model and PSM (Platform Specific Model), bring domain-oriented reusing .
为了追求更高层次的软件复用,2001年OMG提出了模型驱动架构,它以模型构造、模型转换和精化为核心,通过计算无关模型CIM、平台无关模型PIM与平台相关模型PSM的分离,实现了软件面向领域的高层次复用。
2.
MDA is another development method which is driven by various models including CIM (Computing Independent Model), PIM (Platform Independent Model ) , and PSM ( Platform Specific Model ) , and ISM (Implementation Specific Model), and it can also improve reusability of the software within the same domain.
模型驱动架构是以模型为中心,通过计算无关模型(CIM)、平台无关模型(PIM)、平台相关模型(PSM)和实现相关模型(ISM)实现软件的面向领域的高层次复用的开发框架。
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条