1) Sinking
[英]['siŋkiŋ] [美]['sɪŋkɪŋ]
下沉性
1.
Study on Water Stability and Sinking of Shrimp Feeds;
虾饲料耐水性和下沉性研究
2) periodic settling
周期性下沉
3) unsymmetrical subsidence
非对称性下沉
1.
It is clarified that there exists an unstable arch in top coal and overburden and an unsymmetrical subsidence deviating to the roof.
采用相似材料模拟实验研究方法 ,对急斜特厚煤层水平分段放顶煤开采上位顶煤与采场上覆岩层运动与破坏规律以及地表变形进行了系统的研究 ,阐明了上位顶煤与采场上覆岩层存在不稳定拱和地表向顶板方向偏移的非对称性下沉。
4) subsidence
[英][səb'saɪdns] [美][səb'saɪdṇs]
下沉
1.
Influence of Titanium Mesh Subsidence on Cervical Curvature and Surgical Effect after Anterior Cervical Corpectomy Reconstructed with Titanium Mesh and Bone Graft;
颈前路术后钛网下沉对颈椎曲度和手术疗效的影响
2.
Time function of surface subsidence based on Logistic growth model;
基于Logistic增长模型的地表下沉时间函数
3.
The whole process of dynamic surface subsidence deformation was divided into such three stages as subsidence development,full subsidence and subsidence attenuation.
将地表动态沉陷变形发展变化的全过程划分为下沉发展、下沉充分和下沉衰减3个阶段,分析了这3个阶段地表沉陷变形的发展变化规律,提出了地表沉陷变形速度的新概念,研究了地表下沉过程中的地表倾斜变形速度和水平变形速度的发展变化规律,给出了建筑物易受损坏的危险期,水平拉伸(或压缩)变形速度量大于拉伸(或压缩)变形值最大阶段。
5) sinking
[英]['siŋkiŋ] [美]['sɪŋkɪŋ]
下沉
1.
Treatment of the sinking of 3 hole-12.0m reinforced concrete bridge at DK56+665m of Tian-Han line in diggings;
矿区铁路田韩线DK56+665m处3孔12.0m钢筋混凝土桥梁下沉整治
2.
Analysis of sinking of steel open caisson in "Naihai Ⅰ"
“南海Ⅰ号”钢沉井下沉分析
3.
In this artcle,the author states main technological problems of sinking,viation rectifying,soil diging and bottom seal.
沉井依靠自重消除刃脚阻力和外壁摩擦力下沉,本文对该项工艺的下沉、纠偏、挖土、封底主要技术问题进行介绍。
6) settlement
[英]['setlmənt] [美]['sɛtḷmənt]
下沉
1.
Causes of settlement in high embankment and treatment measures;
高填路堤下沉的原因及其处理措施
2.
Dynamic characteristic of track settlement was investigated by combining the vehicle-track coupling vibration model and the track settlement model,and the dynamic response parameters of track structure and the irregularity in the vertical profiles of track were taken as a connection between the two models.
将车辆-轨道耦合振动模型和轨道累积下沉计算模型相结合,以轨道结构动力学响应参量和轨面高低不平顺状态变化作为两者间的联结纽带,从车辆-轨道耦合动力学角度研究了轨道的下沉变形特性。
3.
According to some difficulties encountered in the large scale sunk-well construction in sea mucky layer combined with practical work based upon practical settlement control measures are proposed for sunk-well as well as points for attention to resolve those questions.
针对海淤泥层沉井施工中,易发生涌土、超沉、突沉、地下水大量涌入等现象,结合具体的工程实例,通过沉井下沉计算,阐述了控制沉井下沉的方法,以有效解决施工难点。
补充资料:连续性与非连续性(见间断性与不间断性)
连续性与非连续性(见间断性与不间断性)
continuity and discontinuity
11an父ux泊g四f“山。麻以角g、.连续性与非连续性(c。nt,n琳t:nuity一)_见间断性与不间断性。and diseo红ti-
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条