1) bottom-clearing replacement
清底置换
2) sump filter
油底壳内置滤清器
3) clear bottom
清底
1.
The underground continuous wall construction technology abstract underground continuous wall is suitable with each kind of soil texture, the underground continuous wall construction flow including constructs leads the wall, the slotting, the mud counterfort, the clear bottom, the hoisting reinforcing cage and the irrigation concrete.
地下连续墙适用与各种土质,地下连续墙的施工流程包括修筑导墙、挖槽、泥浆护壁、清底、吊装钢筋笼及灌注混凝土。
4) ASHD
自清洗强化换热装置
1.
Adding ASHD to Condenser of Steam Turbine with Alternator can Improve Power Generation Efficiency;
火电机组凝汽器中加装自清洗强化换热装置可提高发电效率
5) pump converter charge filter
泵转换装置加注滤清器
6) change the bottom
换底
1.
The design to change the bottom of ingot mould is made up of two parts (the ingot mould itself and the moving equipments).
阐述了开发新型锭模的必要性和换底锭模的创新设计思路,扼要介绍了换底锭模的生产方法及其使用效果。