1) whole process cycle of contract management
合同全程周期管理
2) Life-cycle management
全生命周期管理
1.
The concept of cutting tool life-cycle management was put forward,and divided it into four phases: planning period,input time,serviceable life and discarding period.
提出了刀具全生命周期管理的概念,将刀具全寿命周期管理划分为计划期、投入期、使用期、报废期四个阶段。
3) Lifecycle Management
全生命周期管理
1.
The concept of complex product virtual prototype lifecycle management was proposed according to the requirement of CPVPE.
首先针对CPVPE的需求,提出了复杂产品虚拟样机全生命周期管理(CPVPLM)的概念,进而指出CPVPLM作为CPVPE的一项重要支撑技术,能对复杂产品虚拟样机(CPVP)全生命周期中的过程和信息进行全面管理,实现目前PLM尚未实现的功能。
4) Life cycle management
全寿命周期管理
1.
Overall concept of Life Cycle Management of engineering projects;
工程项目全寿命周期管理的整体构想
2.
Study of life cycle management for transmission and transformation assets
输变电资产全寿命周期管理的探索研究
3.
The paper expounds the application of fixed assets geography information system in fixed assets management of electric power enterprise,and the support role of fixed assets life cycle management.
论述了固定资产地理信息系统技术在电力企业固定资产管理中的应用,及在固定资产全寿命周期管理模式中发挥的支撑作用。
5) life cycle management
全生命周期管理
1.
Exploration of life cycle management for information systems by East China Grid;
华东电网有限公司信息系统全生命周期管理的探索
6) Management mode of the whole contract pattern
全程合同管理模式
补充资料:建设用地全程管理
建设用地全程管理
合,要从建设用地总体、总的发展趋势控制、约束建设用地增长速度和数量,把用地与计划、规划有机地结合起来,做到趋近一致。此外,建设用地全程管理还应与征地包干、咨询服务和加强建设用地管理基础工作结合起来。【建设用地全程管理】又称建设用地的“三参三查”管理。土地管理部门在审批项目用地时,参与批前、批中、批后的全过程工作。“批前”,指参与项目立项、可行性研究、扩初设计、用地评议审定和选址踏勘;“批中”,指参与建设项目征、拨用地协议的指导、服务、劳力安置、土地补偿及审查用地的报件;“批后”,指参与建设项目用地的验收、核实土地利用情况,任务是检查项目用地使用性质、用地数量和土地使用等方面有无违法现象。建设用地“三参三查”管理的具体做法是:1.建设用地单位立项后,持建设项目文件,按审批权限向土地部门提出用地申请,提交用地申报有关的建设文件、资料及选址意向,土地部门根据项目的性质、规模,参与建设项目的扩初设计研讨、厂址定点方案比较、评价论证,确定最佳场地方案,并进行现场踏查、选址、定点,确定面积、地类、四至。2.在土地征用、审批过程中,土地部门参与建设单位、被征地单位的协议指导,或责成征地服务部门实行统征包干,防止征地和被征地双方私下协议,做到国家、集体、个人利益“三兼顾”和当地政府、用地单位、被征地群众的“三满意”。3.用地批准后,在使用过程中土地管理部门经常深人用地现场检查、指导用地,发现问题及时解决,工程结束后组织验收发证。建设用地“三参三查”管理是建设用地管理行之有效的措施,在实施过程中,必须与实施指标控制相结合,即坚持用地微观管理与宏观控制相结
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条