1) Claim
[英][kleɪm] [美][klem]
承包商索赔
1.
Research on Claim Management of Contractors under FIDIC Conditions of Contract;
FIDIC合同条件下承包商索赔问题研究
2) Contractor Claims Release
承包商索赔豁免
3) granting a claim
承诺索赔
4) trade claim
商业索赔
5) contractors
[英][kən'træktə] [美]['kɑntræktɚ]
承包商
1.
Views on HSE management on contractors.;
浅谈对基建承包商的HSE管理
2.
How to deal with project amount listing price risks for the contractors;
承包商如何应对工程量清单计价风险
3.
The Risking Research of Contractors in Engineering Construction Bidding Stage;
工程施工招投标阶段承包商的风险研究
6) general contractor
总承包商
1.
Study on Division of Profit and Vertical Integration of General Contractor
工程总承包商的利益分配及纵向一体化研究
2.
Compared with traditional contract models,the general contractors undertake more risks in the implementation process of EPC projects.
与传统的承发包模式相比,总承包商在EPC项目的实施过程中承担着更多的风险因素,因此,项目管理者要有强烈的风险意识,学会控制和防范风险。
3.
This paper sets up the cost models of construction industry and general contractor under the two conditions of vertical integration and non-integration.
只具有设计能力的工程总承包商要实施工程总承包项目,对自己目前缺乏能力完成的施工工作必须决策是分包给施工企业还是培育自身的施工能力。
补充资料:承包工程合同的索赔条款
承包工程合同的索赔条款
承包工程合同的索赔条款为约束签约双方信守合同,保证工程正常实施,因一方违约而造成另一方的经济损失应按合同规定予以赔偿的条款。索赔条款必须明确规定赔偿事项、赔偿条件和赔偿方式。属于承包商违约的通常有:①承包商事先未获得业主书面同意而转让合同②承包商无正当理由不开工,或接到工程师指令后仍停工(停工一般不得超过28天)。③某些材料或工程不符合合同要求.接工程师书面更换、拆建通知后(一般1个月左右)仍不撤换或拆毁重建。④不按合同规定施工,不听工程师警告、无视工程质量和工程师反对意见仍把部分工程转包。⑤承包人破产或归并于债权人,或法院命令必须停业清理。在上述情况下,业主有权书面通知承包商停止合同,退还占有土地,驱逐承包商并没收其履约保证金。对拖延竣工期的承包商,要实行罚款,罚款数额一般不超过合同总金额的3%.提前完成工程或完成部分工程,业主则应支付奖金。属于业主违约的有:①干涉或阻挠工程师签发结算支付证书或未能按合同规定付给承包商,承包人则有权书面通知业主,终止合同。终止合同后,业主除承担终止合同前义务外,还应负担由此给承包人带来的损失和损害。②变更工程和修改设计超过合同规定的比例(一般合同规定不得超过工程量的20%),此时,承包商除向工程师提出延长工期外,还应据此提出索赔和调整工程价格。③施工条件改变,因业主提供不确切的地质资料,港口拥挤或材料紧缺.而加大工程费用或拖延工期所引起的费用,可以向业主索赔。④在合同中明确规定的不可抗力范围内的原因,导致合同解除或延迟合同履行所造成的损害,承包人要详细记录,并及时提出索赔。⑤工程师提出合同规定以外的检验或工程移交前业主已占用,占用后指责工程缺陷而进行修复,承包商可以向业主提出索赔困工程中断或中止(由于业主原因),业主应负担由此而增加的费用或造成的经济损失,工程暂停再复工,承包商有权索鬓髦蒸薰恿黔粼亨篡弩薯霎鼎孺黔
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条