说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 时间管理行为
1)  time management behavior
时间管理行为
2)  Temporal behavior
时间行为
1.
The temporal behavior of photorefractive spatial solitons is studied in this thesis.
本文主要对光折变空间光孤子的时间行为进行了研究。
3)  temporal behaviors
时间行为
1.
Intercultural Differences in Nonverbal Communication──a comparison of temporal behaviors;
非言语交际跨文化差异——时间行为之文化对比
4)  time behavior
时间行为
1.
1nm) and the time behavior has been measured with Optical Spectroscope Multichannel Analyzer and single channel near ultra violet system in HT-6M Tokamak.
1nm)谱线线形分布和时间行为。
5)  management behavior
管理行为
1.
Study of Chinese table tennis team coach group management behavior characteristics;
国家乒乓球教练员团队管理行为特征的心理学探究
2.
The authors studied the management behavior in a library so as to improve the management level and to pursue its value and effect optimization as well.
以“三个代表”重要思想为指导 ,研究与开发图书馆中的管理行为 ,提高图书馆的管理水平 ,追求其价值与效果最大化。
3.
A basic description for deviation problem in management behavior,a feasible assessment method for behavior deviation,and a kind of relevant deviation management thinking will be explored in this paper.
本研究的目的在于对管理行为中的距离难题进行基本的描述,为行为距离提供一种可行的度量方法,并提出相应的距离管理思维。
6)  Behavioral management
行为管理
1.
The Optimization of Accountant Behavioral Management in Chinese Enterprises;
论优化我国企业会计人员行为管理
补充资料:哪些行为属于违反城市规划管理规定的违章行为

凡属于下列情况之一者,均属于违反城市规划管理规定的违章行为:
1、违反《城市规划法》的有关规定和城市规划管理规定要求而发生的有关审批文件和非城市规划行政主管部门关于城市规划管理的审批文件;
2、不具备城市规划设计单位资格(即无城市规划设计单位资格证明)而进行的实施性城市规划设计活动;
3、不按照国家、省(自治区)、市颁布的法规条例、规范、标准和要求而进行的实施性城市规划设计文件与图纸;
4、不符合国家基本建设程序要求和不按照城市规划管理审批程序要求而进行的建设用地项目和各项建设项目;
5、未经城市规划行政主管部门批准同意而在城市规划区内进行的建设用地项目和各项建设项目;
6、未获得城市建设用地规划许可证和不按照建设用地规划许可证要求而进行建设的城市建设用地;
7、未获得城市建设工程规划许可证和不按照建设工程规划许可证要求而进行施工的各项建设项目;
8、城市建设用地规划许可证被吊销之后仍在建设用地和建设工程规划许可证被吊销之后仍在施工的各项建设项目;
9、获得临时用地规划许可证和临时建设许可证而进行建设的半永久性建设项目;
10、一切不符合城市规划要求而擅自进行建设的建设用地和建设项目。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条