说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 金沙江溪洛渡水电站
1)  Xiluodu hydropower station in Jinshajiang River
金沙江溪洛渡水电站
1.
According to the transporting need of the heavy cargo for Xiluodu hydropower station in Jinshajiang River,the following questions on the heavy cargo special wharf in Shuifu port are studied,such as the waterway condition,site selection,load and unload technology,plane layout and hydraulic struture and so on.
根据金沙江溪洛渡水电站重大件设备的运输要求,对水富港重大件专用码头的航道条件、港址选择、装卸工艺、平面布置及水工结构等进行可行性研究。
2)  Xiluodu Hydropower Station
溪洛渡水电站
1.
Application of neural network model with partial least-squares regression to construction of Xiluodu Hydropower Station;
偏最小二乘—神经网络模型在溪洛渡水电站的应用
2.
Prestressed anchor-bar construction in spillway tunnel of Xiluodu hydropower station on right bank;
溪洛渡水电站右岸泄洪洞预应力锚杆施工
3.
Technology improvement of artificial aggregate processing systemof Xiluodu hydropower station;
溪洛渡水电站人工骨料加工系统工艺改进
3)  Xiluodu Hydropower Project
溪洛渡水电站
1.
Mechanical property of the soil slope and its stability on the left side of the dam site of Xiluodu Hydropower Project on the Jinsha River;
金沙江溪洛渡水电站谷肩堆积体力学性质及稳定性
2.
Design of double-curvature flip bucket for spillway in Xiluodu Hydropower Project;
溪洛渡水电站泄洪洞双曲挑坎体形设计
3.
According to the measured geostress data from Xiluodu Hydropower Project, through 3D FEM combined with the linear multivariate regression analysis principle,the neural network as well as the genetic algorithms,the geostress field back analysis are conducted.
根据溪洛渡水电站工程坝区地应力的实测资料,采用有限单元法,结合多元线性回归方法、神经网络方法和遗传算法,分别反演求得整个坝区的初始地应力场。
4)  Xiluodu hydroelectric station
溪洛渡水电站
1.
The fault zones consist of main discontinuities with low dip angle in the dam foundation rockmasses of Xiluodu hydroelectric station.
层内错动带是溪洛渡水电站坝基岩体中广泛发育的缓倾角结构面,查明其渗透变形性质是坝基防渗帷幕设计的基础。
5)  Xiluodu Hydroelectric Power Station
溪洛渡水电站
1.
Selection of 500kV Lead-out Wire for Xiluodu Hydroelectric Power Station;
溪洛渡水电站500kV引出线选择
2.
Selection of artificial aggregate of dam concrete for Xiluodu Hydroelectric Power Station;
溪洛渡水电站混凝土人工骨料的选择
6)  Xiluodu hydroelectric plant
溪洛渡水电站
1.
,as well as the surrounding rock stability analysis of underground cavern,support design and anti seepage drainage design are carried out in combination with topographic and geologic conditions and structure layout for head underground machine hall alternative of Xiluodu Hydroelectric Plant.
对溪洛渡水电站首部地下厂房方案,结合地形、地质条件及枢纽布置,开展了进水口、主厂房、主变室、尾水调压室等的型式研究,以及地下洞室的围岩稳定分析、支护设计和防渗排水设计。
补充资料:巧渡金沙江
      见中国工农红军长征。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条