1) customer outage cost
用户缺电成本
2) user cost
用户成本
1.
The definition of user cost has been refined according to the characteristics of bridge management practice in China.
本文分析了目前我国在桥梁管理中存在的不足,借鉴国外工程实践中的相关概念,在桥梁管理中引入“用户成本”的概念,并根据国内桥梁管理的特点对其进行了更新。
2.
Depending on the structure of user cost and the influence of road blocked to the users, the user cost is assessed.
因道路建设将封闭或部分封闭道路 ,用户将因绕行或车速减缓造成用户损失 ,从而产生了道路建设中的用户成本。
3) customer cost
用户成本
1.
Economic advantages of digital library make it become the important construction item at present, but its high input and risk will request us to pay more attantion to the possibility research which includs the customer cost analysis.
经济优势使数字图书馆成为当代图书馆的重要建设项目 ,但是 ,数字图书馆的高投入及其高风险 ,客观上要求图书馆必须高度重视可行性研究 ,首先要进行用户成本分析。
2.
The final goal of supply chain is to satisfy the demand of customer, but customer cost is one of the important attributes which affects customer s expends.
供应链的最终目的是满足用户的需求,而用户成本是影响消费者消费的重要因素之一,因此,从用户成本角度来考虑供应链成本管理是非常必要的。
4) power outage cost
缺电成本
1.
This paper introduces the classification of power outage cost and the in fluencing factors.
介绍了缺电成本的类型及其影响因素,通过构造用户停电损失函数和利用缺电功率、缺电电量方法以及通过近似构造停电损失评价率,分别介绍了缺电成本的三种调查估算方法,并以此阐述了缺电成本与经济可靠性的关系。
2.
Power outage cost is used to measure the economic losses incurred by power customers during the period of power interruption or electric load constraint.
缺电成本用于衡量断电或限电时用户的经济损失。
3.
First, considering the economic value of different load types and the time effect of power outage cost, this paper presents load shedding cost model based on minimizing power outage cost and proposes economic sensitivity index of load shedding to solve it.
首先,计及不同负荷类型经济价值的差别和缺电损失的时间效应,建立了缺电损失最小的负荷削减费用模型计算缺电成本,提出了削减负荷的经济性灵敏度指标对模型进行求解。
5) unserved energy cost
缺电成本
1.
It is necessary for power supply company to increase reliability investment cost in order to improve power supply reliability of distributed network and decrease consumer unserved energy cost on distribution network planning,however,if the power company blindly pursuit power supply reliability,it certainly results in sharp increase of reliability investment cost.
在配电网规划中要提高配电网的供电可靠性,减少用户侧的缺电成本,必然要求供电部门增加可靠性投资成本,然而盲目地追求供电可靠性,必然导致供电部门可靠性投资成本急剧增加。
6) outage cost
缺电成本
1.
The investment cost is introduced to indicate economy, the outage cost of customers is adopted to evaluate the reliability, and available transfer capability (ATC) is proposed to quantify the flexibility of the network for the first time.
经济性指投资费用,可靠性采用需求方的缺电成本衡量,灵活性首次引用可用输电能力(ATC)来量化。
2.
Through the introduction of outage cost combining the reliability and economy, a new mathematical model and cost-benefit analysis method of power network planning is presented in this paper.
该文通过引入缺电成本,将可靠性与经济性结合在一起,在此基础上提出了一种新的电网规划成本-效益分析方法与数学模型,该方法将缺电成本作为供电总成本的重要组成部分,并且用缺电成本的大小来衡量可靠性效益的高低,将规划的可靠性成本与可靠性效益统一在对电网的经济性评估上。
补充资料:用户继电保护管理
用户继电保护管理
relay protection manage-ment for customers
yongnu J.dlon boohu guanll用户继电保护甘理sgement for eustomers)(relay Protection man- 继电保护装里是电力系统的重要组成部分.当电力系统出现不正常运行时,它能及时发出信号或普报,通知运行值班人员进行处理;当电力系统发生事故时,它能自动将故障切除,防止事故的扩大,确保电力系统(非故障部分)安全运行。因此,首先要求继电保护装里动作有选择性,即只切除故障的电气元件;其次要求其动作迅速,即切除故障时间尽可能短,以及缩小事故的范围和减轻事故的影响;第三.要求对保护范围内出现的故障有灵敏的反映能力;第四,要求动作可靠,不发生拒动、误动。 由于用户内部发生的事故有可能因用户继电保护装!配合不当或拒动,迫使电网继电保护动作,造成越级跳闸,扩大事故范围,影响对其他用户供电。为预防上述现象的出现,并确保用户继电保护动作的准确可靠,电力企业必须对用户的继电保护进行管理。 电力企业对用户继电保护管理的内容有: (1)在新建扩建用户受电工程时,对用户受电装t的继电保护方案进行审核。 (2)计算确定或审定用户的继电保护整定值,又称定值管理。用户受电装置的进出线、主变压器、母线等的继电保护装置整定值,一般由电力企业计算确定,并将整定值通知用户。用户内部的其他元件的继电保护装里定值可由用户自己计算确定亦可委托电力企业计算确定。用户受电装置发生改变,需要改变继电保护定值时,属于电力企业管辖的继电保护装t,要事先通知电力企业,在继电保护重新计算整定以后,方可以改变受电装置的运行方式。 (3)在电力系统运行方式改变时,向用户提供继电保护装!整定计算所需的系统参数。 (4)统一编制用户继电保护定期检修计划和反事故措施,并组织实施。 (5)参与用户供电工程接电前的继电保护装!的调试检验,又称检验管理。为保证继电保护动作准确可靠,不仅对新投人的继电保护装置要进行检验,而且对已投人运行的继电保护装!也要按周期进行检验。调试检验项目与周期按规程规定的要求进行。用户受电装l的进口继电保护检验,一般由电力企业承担,用户内部继电保护的检验由用户自己承担,也可委托电力企业或有调试力货的单位承担。调试检验要做好记录,调试检验中发现的异常情况要及时排除,并将检验结果写成书面报告送交运行单位备查。电力企业还要参与用户事故扩大、继电保护误动时的临时性检验。 (6)对用户继电保护专职人员进行技术培训. (7)指导用户搞好继电保护日常运行工作.
说明:补充资料仅用于学习参考,请勿用于其它任何用途。