3)  backwall grouting
壁后注浆
1.
By using the combined support technology of concrete sprayed anchored net,anchorage cable and backwall grouting in the mechanical and electronic underground chamber of Shuangmiao extending area of Gedian Mine,Shenhuo Coal and Electricity Joint-stock Company,the tunnel condition is effectively improved,the deformation of the surrounding rock is inhibited.
介绍了根据硐室布置的岩层和地质条件及机电硐室设备布置的具体要求,神火煤电股份有限公司葛店煤矿双庙扩大区井底车场机电硐室(泵房、变电所)成功采用锚网、锚索、壁后注浆联合支护技术;实现了多次支护的抗压作用,保证了大断面机电硐室的有效施工,确保了机电设备的安全运行。
2.
This paper introduced backwall grouting process and grouting effect of-290 level downcast shaft in Jilongshan Gold Mine.
介绍了湖北鸡笼山金矿-290中段进风井壁后注浆施工工艺过程和注浆效果,并对壁后注浆技术经济效益进行了分析。
4)  Retrobulbar injection
球后注射
1.
Anesthetic and side effects following retrobulbar injection of Tetrodotoxin in rabbit;
家兔眼球后注射替曲朵辛的麻醉效果及毒副作用研究
2.
Clinical study of retrobulbar injection of triamcinolone acetonide for treatment of Graves ophthalmopathy;
球后注射曲安奈德治疗Graves眼病的临床研究
3.
Clinical study on the treatment of amblyopic children with podamine and vitamin B_(12) by retrobulbar injection;
多巴胺和维生素B_(12)球后注射治疗儿童弱视
5)  grouting behind segment
壁后注浆
1.
Test and Application of GPR Detecting of Grouting Behind Segment of the Shield Tunnel Across the River;
越江公路盾构隧道壁后注浆探地雷达探测试验及应用研究
2.
When we use the ground penetrating radar(GPR) to detect the effect of grouting behind segment at the shield tunnel tail,it is very important to ascertain the velocity of electromagnetic wave(EMW) to obtain accurate results.
利用探地雷达(GPR)方法探测软土盾构隧道盾尾壁后注浆分布效果时,电磁波在介质中的传播速度是准确识别介质界面的关键。
3.
And the grouting behind segment at the tail is more focused on for controlling the surface settlement.
盾构隧道的纵向力学与变形性态研究,尤其是盾尾壁后注浆效果已经引起国内外学者的广泛关注,笔者首次利用探地雷达方法,对上海某盾构隧道盾尾壁后注浆分布进行探测,并进行了初步的分析,结果表明,利用该方法可有效地探测隧道壁后的注浆分布,为隧道纵向力学变形性态的控制提供一定依据。
6)  backfill grouting
壁后注浆
1.
Utilizing the self-made element model devices of backfill grouting,the change laws of grout deformation and grout pressure dissipation are studied under different grouting pressures,different grout material mixtures and different soil conditions.
壁后注浆是盾构施工的关键工序。
2.
During the construction with shield machine, backfill grouting is a necessary and key procedure, which can actively control stratum displacement and ground-stress release by filling the shield tail void, and thus reduce surround soil displacement and surface settlement.
使用盾构法施工时,对盾尾空隙进行壁后注浆是盾构施工的必备及关键工序,通过充填盾尾空隙以达到主动控制地层沉降及地层应力释放的目的,从而减少隧道周围地层位移和地表沉降。
参考词条
补充资料:《保护字型及其国际注册维也纳协定》
      关于保护印刷字型的国际协定,简称《维也纳字型协定》。1973年由法国、德意志联邦共和国、匈牙利、意大利、列支敦士登、卢森堡、荷兰、圣马力诺、瑞士、英国、南斯拉夫等11个国家签署。协定所称的字型,是指印刷出版文字作品所使用的印刷字体,包括字、字母、数字以及标点符号和科学符号等。协定要求各参加国通过国家特别注册、工业设计注册或版权法,对一切新颖的、有独创性的字型设计给予保护,并给其他缔约国国民发明的字型以与本国国民相同的保护。协定规定,字型的设计者或字型设计权利的所有者有权禁止他人擅自仿制和复制其字型,有权禁止他人擅自销售或进口未经许可的字型复制品。字型设计权利的保护期不少于15年。协定还规定建立国际注册制度,通过协定签字国主管当局将各国的字型在国际注册所登记。协定的签定有利于扩大知识产权国际保护的范围,有利于保护字型设计者的权益和这一古老艺术形式的发展创新。 由于协定须经5个国家批准方能生效,到1988年1月1日,仅有两个国家送交了批准书,因此协定尚未生效。协定附加议定书将字型保护期延长至不少于25年,亦因仅有两国批准而未生效。协定将由总部设在日内瓦的世界知识产权组织负责实施管理。
  