1) TSM (Time-Scale Modification)
时间尺度调整
2) time scale
时间尺度
1.
Spatial simulation of the responses of species extinction to human-caused habitat destruction at different time scales;
物种灭绝对不同时间尺度栖息地毁坏响应的空间模拟
2.
Analysis of ecological health status at time scale in sandy area;
固沙区时间尺度上生态健康状况分析
3.
Derivation and validation of watershed coupled water-energy balance equation at arbitrary time scale;
任意时间尺度上的流域水热耦合平衡方程的推导及验证
3) Temporal scale
时间尺度
1.
Responses of runoff to vegetation alteration at different temporal scale;
不同时间尺度径流对植被变化的响应
2.
Based on the clarification of the character of scale, the spatial and temporal scale of river ecosystem restoration is discussed in detail.
时间上,可分为短、中、长与极长4个尺度,修复对象达到稳定状态所需时间越长,所需选择的时间尺度越大,河流生态系统修复一般关注的是短、中与长3个时间尺度。
3.
The author points out that basic selection of the spatial temporal scales for traditional forest management unit was wood production orientated, having intrinsic deficiency in adjusting to SFM.
在简析景观管理与一般可持续发展研究关系基础上,从镶嵌体稳定和动态整体优化、对生物多样性保护工作的融合、生态服务功能表现的尺度依赖特征、采伐等行业实践的景观尺度影响、与其他景观尺度土地可持续管理工作的协调等角度重点论证景观尺度对于设计、管理以及度量森林可持续经营的独特价值;同时提出并初步讨论流域生态区、生态周期以及与景观相对应的世代尺度等时间尺度在森林可持续经营与发展中的应用。
4) time scales
时间尺度
1.
Runoff generation characteristics on three time scales for typical stands in Jinyun Mountain,Chongqing City;
重庆缙云山典型林分3种时间尺度下产流特征研究
2.
Video similarity matching algorithm supporting for different time scales
一种支持不同时间尺度的视频相似性匹配算法
5) setup time
调整时间
1.
Lot-streaming in three-stage flow shop with setup times separated;
三台机器流水作业中存在不同调整时间的Lot-streaming问题
2.
For the lot-streaming problem in multi-stage flow-shop,the majority of the research in the past used to fix the number of the batches and find only the optimal batch sizes without consideration the setup time:In this paper,however,Setup time for the machines is introduced.
多台机器流水作业的 Lot-streaming问题(简称LS),以往的研究都不考虑调整时间,固定分批数,寻找最优分批大小;本文对机器引入调整时间,研究同时决定最优分批数及分批大小,并给出了相应最优算法。
3.
For the Lot-Streaming problem in a two machines flow shop, the majority of the research presented fixed the number of the sublets, or the two machines have the same setup times.
对二台机器流水作业中的Lot-Streaming问题(简称LS),以往的研究多为固定分批数寻找各批大小,或对二台机器引入相同的调整时间,寻找最优分批数及各批大小。
6) setup times
调整时间
1.
This paper deals with the order planning of single machine with multi product classes and sequence independent setup times, and proposes a mixed integer programming model to minimize the sum of earliness/tardiness penalties of orders.
针对单机多产品多订单有序独立机器调整时间的订单排产问题 ,建立了以最小化订单的提前和拖期罚值总和为优化目标的混合整数规划模型 ,分析了问题的NP -hard性和最优排序中临近批组的优化特性 ,提出一个基于过滤束搜索的拟多项式时间算法 ,算法复杂性分析和仿真结果验证了算法的有效性 。
2.
In this paper,several parallel machine scheduling problems with setup times are discussed.
本文讨论带有工件调整时间的几种平行机排序问题,分析在不同情况下的计算复杂性。
3.
To efficiently solve multi-objective flow shop scheduling problem with setup times,a new multi-objective hybrid genetic algorithm(MOHGA) was proposed.
为高效地求解带调整时间的多目标流水车间调度问题,提出了一种多目标混合遗传算法,此算法依据基于Pareto优于关系的个体排序数和密度值计算适应度,保持解的多样性,并采用非劣解并行局部搜索策略,提高算法的搜索效率。
补充资料:调整保留时间
分子式:
分子量:
CAS号:
性质:见保留时间。
分子量:
CAS号:
性质:见保留时间。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条