1.
The importance of on-load test of longitudinal differential protection for main transformers in substations is explained, and the test points, standards, and condition are discussed.
论述了变电站主变压器纵差动保护带负荷测试工作的重要性,并就测试点、测试标准、测试条件等进行了探讨,同时介绍了带负荷测试的方法及步骤。
2.
Aiming at different problems possibly occurred in the process of design, installation and setting for bus differential protection, the contents of on-load test and the analysis and diagnosis methods have been put forward in light of the principle of bus differential protection.
针对母线差动保护在设计、安装、整定过程中可能出现的各种问题 ,结合母线差动保护原理 ,提出了带负荷测试的内容及分析、判断方
3.
Some potential problems may be occurred on the newly-installed transformer during the process of design,construction and setting,thus the on-load test after commissioning is rather necessary,and it s an indispensable item which ensures the accurate operation of differential protection.
新安装就位即将投入运行的变压器差动保护,在设计、施工、整定过程中有可能出现各种问题,因此,对投运后的变压器差动保护实行带负荷测试是十分必要的,也是差动保护正确投入后不可缺少的试验项目。
4) load survey instrument
负荷测试仪
1.
Based on the load survey instrument,a new method of allocating current coefficients to calculate energy losses is put forward in this paper.
针对已安装配电负荷测试仪的配电网线路 ,本文提出了计算线损的电流分配系数法 。
5) load-testing vehicle
负荷测试车
1.
With the development of technology, the disadvantages of the acquisition system of load-testing vehicle that used to testing traction capability developed by the experts in all of the world since .
虽然八十年代以来国内外先后开发了专用的负荷测试车的采集系统进行牵引性能试验,但随着技术进步,显露出这类采集系统的不足:对试验所测量的牵引力、车速度、油耗、驱动轮转速等各项参数只能在仪器的数码管上显示一种参数,而不能同时显示多个参数,不能对实验过程全面监视,寻找最大牵引功率点往往凭经验来完成等。
6) testing data
测试数据
1.
Application of chart in Excel to geophone testing data statistics.;
Excel图表在统计检波器测试数据中的应用
2.
In order to achieve the goal that the well testing data transferring in time, in tegrity and accurate, on the basis of reserving originally possessed the functio n foundation of the kit software of the electronics pressure gauge, a set of new management software which suits to the data processing currently is developed.
为实现试井测试数据信息传输的及时、完整、准确,在保留原有电子压力计配套软件的功能基础上,研制开发出一套全新的适应目前测试资料处理的管理软件,该软件实现了电子压力计与计算机的源数据通讯、测试资料计算处理、辅助分析、流计、查询、输出报表、数据保存、远程数据库管理等功能,优化了试井数据的处理过程。
3.
The paper focuses on the generation of software testing,and uses the method of genetic algorithm to build a model of software testing data generation.
文中针对软件测试中测试数据生成问题作了重点研究,采用了遗传算法解决按路径生成测试数据的问题,构建了基于遗传算法的测试数据生成系统模型,并对系统模型进行了实例验证。
补充资料:测试数据处理
测试数据处理
data processing of testing results
eeshi shuju ehul:测试数据处理(data proeess庄ng of testingresults)在选矿测试技术中,对测试的信号要进行加工处理,包括完成滤波处理,工程量变换,线性化处理,标准化处理(包括定标,死时间校正,漂移校正,标准化系数校正,测量值上、下限检验等),再经过测试仅器标定,把仪器测得的表观值变为实际值;对于动态测量还包括数据的采取,检验和取舍,转换,预处理以及确定动态特性指标,数学模型等。数据处理内容有计算测量精度、测量平均值,求出标准偏差;必要时进行组合测量;最终对所得实际值进行误差分析和统计检验。从狭义说,测试数据处理仅指此最终过程。在现代自动测试系统中,数据采集和处理均由计算机系统控制,包括自动完成最终数据的分析检验;输出的信息可满足显示、打印或记录、贮存、控制等要求。 测量精度被测对象多为样品而非总体,而且测试中必有误差,即测试得不到被测参量真值,必须根据误差理论对所得结果的可能彼动范围作出一区间的估计,并指出这种估计的可靠程度。用仪表测得的被测参量的测得值和其真值的接近程度为测量精度,二者之间的差即为测量误差。测量误差包括粗大误差、系统误差和随机误差。 测量平均值由数理统计证明,通过有限的N次 等精度测量,所得的测得值x、的 算术平均值 N 王一责馨二、 为该被测参量的真值的无偏估 计。 标准偏差工程测量的随机 误差绝大部分都近似地符合正态 分布,由此可求出测量的标准偏差 ;*一德 式中次为测量残差,民一x*一王。可 A 以按照次妻3。的原则,剔除测量中 的粗大误差;对于系统误差除可根 据民值的规律性判断是否存在 外,有时还须通过统计检验方可查明;要寻找出系统误差存在的原因,并设法消除或修正。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条