1) the non-standardized design
非标准设计
1.
So, how to resolve the question, and the method of the non-standardized design of belt conveyors became the key to us.
传统设计对设计手册里已有系列型谱数据的带式输送机无疑是快速简便的,而对于设计手册里没有系列型谱的零部件设计人员必须对其进行重新设计,如何在较短时间内完成设计任务是亟待解决的问题,输送机的非标准设计也就自然成为我们研究的主题。
2) non-standardized design
非标准化设计
3) design criteria
设计标准
1.
According to the requirement for reconstructio n of wastewater treatment plant, the design capacity, design criteria, and reconst ruction scheme were discussed, and some suggestions were presented.
针对污水厂的改造要求,对污水厂改造中的设计规模、设计标准和改造方案等进行了探讨,并提出了建议。
2.
Based on the latest revision of the seismic isolation codes of the major seismic countries such as China,the Unite States,Japan,and the European countries,the design criteria,the product standard and maintenance criterion of base isolation in building structures are compared in this paper.
收集整理了世界主要国家(如中国、美国、日本以及欧洲的国家)最新修订的建筑结构规范中对建筑结构基础隔震标准化研究的情况及具体规定,并做了相互的对比分析,内容包括:基础隔震的设计标准、产品标准与维护标准等。
3.
After the analysis on the cause of the disaster and its serious influences,a review about the design criteria of overhead power lines and comparison between the design criteria of transmission lines home and a- board are elaborater.
通过对电力线路设计标准的思考,比较了国内外输电线路设计标准,提出了差异化设计的理念,并对完善输电线路设计和设防提出了建议。
4) design criterion
设计标准
1.
Some questions that are met frequently in design and different ideas about design criterion are put forward.
针对框架结构采用不同阻尼比、基础方案等问题进行数据对比分析 ,总结设计中常见问题和注意事项 ,对设计标准提出不同意
2.
The research addresses the identification of the trestle design criterion, selection of appropriate methods for calculating the wind, wave and tide actions at the estuary site, analysis of the vertical bearing capacity of the open-end steel-pipe piles, and evaluation of.
本文以杭州湾跨海大桥南岸超长栈桥为工程背景,针对在恶劣环境条件下,尤其是在海洋环境条件下修建临时栈桥所面临的难题,如栈桥设计标准的确定,风、浪、流等环境作用计算方法的选取,对栈桥工程中常用的开口钢管桩的竖向承载力计算和栈桥的水平极限承载力分析等问题,进行了较为系统的研究。
3.
Owing to the deficiency in the design theory and practice, there is an urgent demand to study the design criterion of plan location and longitudinal profile of railway line for both high/medium speed passenger dedicated line transportation and express passenger/low-speed freight transportation.
由于相应的设计理论基础薄弱,工程实践欠缺,因此研究高速、中速客车共线及快速客车与低速货车共线条件下的铁路线路平面、纵断面设计标准成为当务之急。
5) Design standard
设计标准
1.
Design standard for establishing PIVAS at all levels of hospitals;
对医院建立静脉药物配置中心设计标准的探讨
2.
Study on design standard of de-silting basin for irrigation;
灌溉沉沙池泥沙设计标准研究
3.
Study of design standard for lateral stiffness of railway bridge piers;
铁路桥墩横向刚度设计标准的研究
6) design standards
设计标准
1.
Classification for chemicals and design standards for ships carrying chemicals in bulk;
化学品分类及散化船舶设计标准(英文)
2.
The paper states the particularity of the design of the urban Binjiang Road Sector in the design standards,structural form and foundation treatment etc.
本文从设计标准、结构形式、地基处理等方面阐述城市滨江路设计的特殊性并提出相应建议。
3.
The economic evaluation in selection of design standards for waterlogging control had never been proceeded all over the county.
排涝设计标准的选择,各地大都没有进行经济比较论证,都是凭经验确定。
补充资料:标准设计
在一定时期内,采用共通性的条件(建筑材料、设备和生产能力等),有统一的模式要求,技术上成熟,经济上合理,适用范围比较广泛的设计。它是工程建设标准化的一个重要方面,是组织现代化工程建设的重要手段。
在中国,标准设计按适用范围分为三类:①国家标准设计。是对全国工程建设具有重要作用的,跨行业、跨地区、必须在全国范围内统一采用的设计,由主编部门提出报国家主管基本建设的综合部门审批颁发。②部标准设计。主要是在全国各专业范围内必须统一使用的设计,由各专业主管部门审批颁发。③省、市、自治区标准设计。主要是在本地区内必须统一使用的设计,由省、市、自治区主管基本建设的综合部门审批颁发。标准设计一经批准颁发,就具有技术立法性质,各级生产、建设管理部门和各企业、事业单位都应因地制宜积极采用,无特殊理由不得另行设计。
标准设计的编制,一般分为初步设计和施工图设计两个阶段。前一阶段,主要是确定设计原则和技术条件,提出技术经济合理的设计方案;后一阶段是根据批准的初步设计,提出符合生产、施工要求的施工图。重大项目或技术复杂的项目,可分为初步设计、技术设计和施工图设计三个阶段。技术简单的项目,可简化为施工图设计一个阶段。
采用标准设计的优点是:①设计质量有保证,有利于提高工程质量;②可以减少重复劳动,加快设计速度;③有利于采用和推广新技术;④便于实行构配件生产工厂化、装配化和施工机械化,提高劳动生产率,加快建设进度;⑤有利于节约建设材料,降低工程造价,提高经济效益。
在中国,标准设计按适用范围分为三类:①国家标准设计。是对全国工程建设具有重要作用的,跨行业、跨地区、必须在全国范围内统一采用的设计,由主编部门提出报国家主管基本建设的综合部门审批颁发。②部标准设计。主要是在全国各专业范围内必须统一使用的设计,由各专业主管部门审批颁发。③省、市、自治区标准设计。主要是在本地区内必须统一使用的设计,由省、市、自治区主管基本建设的综合部门审批颁发。标准设计一经批准颁发,就具有技术立法性质,各级生产、建设管理部门和各企业、事业单位都应因地制宜积极采用,无特殊理由不得另行设计。
标准设计的编制,一般分为初步设计和施工图设计两个阶段。前一阶段,主要是确定设计原则和技术条件,提出技术经济合理的设计方案;后一阶段是根据批准的初步设计,提出符合生产、施工要求的施工图。重大项目或技术复杂的项目,可分为初步设计、技术设计和施工图设计三个阶段。技术简单的项目,可简化为施工图设计一个阶段。
采用标准设计的优点是:①设计质量有保证,有利于提高工程质量;②可以减少重复劳动,加快设计速度;③有利于采用和推广新技术;④便于实行构配件生产工厂化、装配化和施工机械化,提高劳动生产率,加快建设进度;⑤有利于节约建设材料,降低工程造价,提高经济效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条