1) steel pipe track
管料跟踪
1.
It includes programming logical controller,digital direct current adjustable rate system,steel wick stick s crackle detect system,steel pipe track system.
整个系统由可编程控制器、全数字式直流调速系统、芯棒断裂检测系统、管料跟踪系统等构成。
2) Material tracing management
物料跟踪管理
3) material tracking
材料跟踪
1.
Electrical equipments and software programs for the material tracking system for Baosteel's 5m heavy plate mill were provided by Siemens.
宝钢5 m厚板轧机材料跟踪系统电气设备及软件程序全套由德国西门子提供。
2.
The whole electrical equipments and software of material tracking system for 5 m heavy plate mill of Baosteel were provided by Siemens.
宝钢5 m宽厚板轧机材料跟踪系统的全套电气设备及软件程序均从德国西门子公司引进。
3.
The main systems of finish rolling process automation of semi-continuous hot-strip mill of Anshan iron and Steel Complex are presented in this article, including material tracking system, control models and cooling control system.
本文介绍鞍钢半连轧厂精轧过程自动化主要系统,包括精轧材料跟踪,精轧控制模型和冷却控制。
4) material tracking
物料跟踪
1.
Research on material tracking management system for iron and steel enterprises;
钢铁企业物料跟踪管理系统研究
2.
Research of Material Tracking System Oriented Overall Supply Chain;
面向供应链全程的物料跟踪系统研究
3.
Study on material tracking model oriented to small and medium manufacturing enterprise
面向中小型制造企业的物料跟踪模型研究
5) trace of furnace charge surface
料面跟踪
6) tracking management
跟踪管理
1.
Technical specialties of the system were explicated to realize digital tracking management in loading, transportation, verifying, incineration and residues treatment of medical waste with bar code, GPS, GPRS, monitoring online and other information technology.
该系统利用条形码技术、GPS(全球卫星定位系统)、GPRS(General Packet RadioService)、在线监测等信息技术实现了对医疗废物的装载、运送、核实、焚烧、残渣处理的全程数字化跟踪管理。
2.
Objective: To analyze the management of supply chain of sterilized instrument both at home and in abroad, and to provide some bases for tracking management of supply chain of sterilized instrument in China.
[目的]对国内外消毒器械供应链的管理进行分析,为国内消毒器械供应链的跟踪管理提供依据。
3.
Cost tracking management can be improved by changing method from static management to dynamic management.
以往的施工阶段投资管理为静态管理,无法有效的控制工程投资,投资跟踪管理方法可以将静态的投资管理改变为动态的投资管理,从而更有效的进行工程投资管理。
补充资料:巧用多线段来算圆管下料实长
先来看看圆管的图纸,大家可以按住ctal键+鼠标中键来缩放图片大小
图1
图2
图3
图4
图5
6:画圆是做参考
图6
图7
8:ext面拉升的时候选择的是按路径拉升p
图8
9,这一页很重要
图9
图10
图11
图12
图13
图14
在算下料实长的时候,许多都是采用直接在cad查询,得到结果与实际的下料实长是非常精确的
多线段可以使线条整体化,有利于得到结果.如果不进行多线段合并的话,大家可以选择每条线按ctal+1键分别查询,在叠加.
在画三维的时候,我们很多时候都是在平面绘图在进行面域,面域的前提就要封闭的论坛,如果有时进行面域不行的时候,大家可以先把他转换成多线段在检查,是哪里的线条断开,在操作.
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条