说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 水平平台
1)  level platform
水平平台
1.
The thesis based on 3G level platform presents design and implementation of fault management in operation and support system.
本论文立足于电信管理论坛(TMF)提出的新一代运营系统和软件(NGOSS),以中国网络通信集团公司设计研发的3G水平平台为依托,对运营支撑系统中的故障管理进行了深入的研究,给出了运营支撑系统故障管理子系统的设计与实现。
2)  underwater platform
水下平台
1.
It also provides a method for correcting the determing target track deflection which is caused by the underwater platform inclination an swing due to water flow, which is simplyfied when the underwater platform inclination is not great, The data obtained from oceanic experiments are applied to do simulation proofs.
给出了非固定水下平台对水面目标航迹的确定方法,提供了一种方 法修正平台倾斜和旋转对确定目标航迹带来的影响,并在平台倾斜不大时进行了简化,最后利用仿真数据进行了仿真验证。
2.
Serious biases in both the long-range detection and accurate location track, may be caused by the rocking of underwater platform in the complicated ocean current and tide, and may become great barricades on target detection, identification and classification.
水下平台由于处于海流、潮汐之中,引起平台自身的晃动与扰动,导致平台在远程探测、精确定位跟踪中产生严重偏离,对探测系统进行目标探测、识别、分类等工作形成障碍。
3)  underwater platform
水中平台
4)  attached building
尾水平台
1.
The vibration and the extra dynamic stresses are detected for the attached building at all kinds of working conditions.
水电站尾水平台在正常运行时发现有较大的振动。
5)  shallow-water platform
浅水平台
1.
Research on structural modification and application of electric submersible pump used in shallow-water platform of JZ9-3E oilfield;
锦州9-3东油田浅水平台电潜泵结构改进与应用研究
6)  water affinity platform
亲水平台
1.
This article in view of the water affinity platform project design question, through the location diagnosis, balances this principle of design with the conceptual design control stress, Uses topdown construction method The counter-pressure anchor rod static pressure pile, had achieved deals with issue which the ground and foundation synchronization completes.
针对亲水平台地质勘察报告中的资料不完整、评价不正确、地基处理换填法结论错误的问题,依据实际场地情况结合地质剖面资料进行了分析与判定,提出用反压锚杆静压桩法处理亲水平台,实践证明这一实例获得了最佳的社会与经济效益。
补充资料:半潜式钻井平台
      一种海上钻井装置。上部为工作甲板,下部为两个下船体,用支撑立柱连接。工作时下船体潜入水中,甲板处于水上安全高度,水线面积小、波浪影响小、稳定性好、自持力强、工作水深大。半潜式平台用锚和钢丝绳定位,工作水深为180m左右;用锚和链结合定位,工作水深可提高到450m。新发展的动力定位技术用于半潜式平台后,工作水深可达900~1200m,定位精度在1~2%水深的半径范围内。半潜式与自升式钻井平台相比,优点是工作水深大,移动灵活;缺点是投资大,维持费用高,要有一套复杂的水下器具,有效使用率低于自升式。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条