1) base frame
基础框架要素
3) Basic Framework
基础框架
1.
Method of the Basic Framework on the Informatization of Urban Planning
规划信息化基础框架的构建方法
4) frame factor
框架要素
1.
A study on updating the frame factor of 1:50,000 topographic map with satellite remote sensing image data;
利用卫星遥感影像资料更新1:5万地形图框架要素的探讨
5) frame foundation
框架式基础
1.
Modal analysis for a 1∶10 model of turbine-dynamotor frame foundation;
汽轮发电机框架式基础1∶10模型动力分析
2.
Sensitivity analysis of mat thickness on dynamic behavior of turbine frame foundation;
机组框架式基础动力特性对底板厚度的灵敏度分析
3.
In this paper,the vibration characteristics of frame foundation for steam turbine-generator set are performed by model modal test method.
采用模型模态试验方法对汽轮发电机组框架式基础的振动特性进行了研究。
6) framed foundation
框架式基础
1.
Model test research of framed foundation of turbine-generator set;
汽轮发电机组框架式基础模型试验研究
2.
Dynamic Analysis of the Framed Foundation for the Steam Turbine-generator Set;
汽轮发电机组框架式基础的动力分析
3.
Equipment rigidity treatment in finite element dynamic analysis of framed foundation of large steam turbine generator
设备刚度在大型汽轮发电机框架式基础动力分析中的处理方法
补充资料:全部要素生产率与部分要素生产率
全部要素生产率与部分要素生产率
全部要素生产率与部分要素生产率经济增长是由劳动、资本、土地、技术等各种生产要素的投入引起的。美国经济学家E.丹尼森认为,可以通过计算各种生产要素的耗费量与经济增长率之间的相关关系分析出每一种生产要素对经济增长所起的作用。某种生产要素的单位投入所引起的经济增长率就是该要素的部分要素生产率。它的测算方法是:首先以实际国民收入的增长率为主要指标来计算经济的实际增长速度,然后通过确定历年各生产要素的收入分配在国民收入总额中所占的比重,即各要素收入的分配率,和各要素耗费量在总要素耗费中所占的比重,即各要素耗费率,以及影响单位综合要素投入产出水平的各种因素的变化,进行综合权衡,推算出各种要素经济增长的贡献率,即部分要素生产率。 美国经济学家肯德里克提出的全部要素生产率增长分析理论即产量与全部生产要素投入量之比,是分析经济增长因素的又一方法。这种理论认为全部生产要素对生产提供服务,从而提供相应的产量,因此把总的产量归结为各个生产要素的共同结果,就是全部要素生产率增长分析。全部要素生产率理论认为,通常使用的部分要素生产率只是从某一方面反映技术和效益水平,全部要素生产率才能全面地反映出技术和效益水平。其计算方法是按照一定的权重,将资金投入和劳动投入进行加权平均,用这一平均值去除产出水平。用公式表示为:全部要素生产率- YaK十尸L式中,Y为产出,K为资金投入,L为劳动投入,a、月为权重。全部要素生产率能更准确地反映要素投入的产出效果,但由于a、月的确定带有一定的主观性,因而也不可能有绝对准确。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条