说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 灰度相关跟踪
1)  Gray related tracking
灰度相关跟踪
2)  grey-track
灰度跟踪
3)  correlation tracking
相关跟踪
1.
Preliminary research of sonomyography(SMG) based on correlation tracking;
基于相关跟踪的声肌图(SMG)初步研究
2.
Effect of the dynamic transmutation interfering the arithmetic of correlation tracking;
动态变形伪装对相关跟踪的干扰效果研究
3.
Application of correlation tracking algorithm to underwater object in high-speed motion;
相关跟踪算法在水下高速运动体识别中的研究
4)  correlation tracker
相关跟踪器
1.
In order to improve dynamic range and effective bandwidth of the correlation tracker in a space solar telescope,the beryllium was optimally chosen as a space mirror material to fabricate a tip-tilt mirror of correlation tracker.
根据空间镜面材料选择原则进行了摆镜材料优选,研制了用于空间太阳望远镜相关跟踪器中的铍摆镜,建立了铍摆镜有限元模型并进行了力学分析。
5)  Direct gray-scale image tracing
直接灰度图跟踪
6)  partial derivative correlation tracking
偏导相关跟踪
1.
Firstly,this paper brings in one kind of arithmetic of TV-guidance and template s adaptive updating,based on partial derivative correlation tracking,for TV-guided bombs.
文中首先针对电视制导炸弹的特点,提出了一种基于偏导相关函数的电视图像跟踪算法和模板自适应更新算法,然后在此基础之上设计出偏导相关跟踪器并做了仿真试验。
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
  成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。

  非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条