1)  objectArx
ObjectARX开发包
2)  OB
OB
1.
Research of Synthetic Process of Fluorescent Whitening Agent OB;
荧光增白剂OB合成工艺的研究
2.
Regulation of SOCS-3,OB,GLUT4 and PPARγ Gene Expression by Insulin and Dexamethasone in Porcine Primary Adipocyte;
地塞米松和胰岛素调节猪脂肪细胞SOCS-3、OB、GLUT4和PPARγ基因的表达
3.
Expressions of Wnt1,Nestin and β-catenin in the region of SVZa-RMS-OB in mice;
Nestin、Wnt1和β-catenin在小鼠SVZa-RMS-OB通路的表达
3)  CAS-OB
CAS-OB
1.
Analysis on Ladle Nozzle Clogging in Casting CAS-OB Treated non-Al-killed Liquid Steel;
浇铸CAS-OB处理的非铝镇定钢水口堵塞原因分析
2.
Study on Powder Penetration Behavior in CAS-OB Process With Powder Injection;
CAS-OB喷粉过程中精炼粉剂穿透行为的研究
3.
Burdening Calculation Model of Powder Injection in CAS-OB Refining Process;
CAS-OB喷粉精炼粉剂配料计算模型
4)  RH-OB
RH-OB
5)  ANS-OB
ANS-OB
1.
Factors Affecting Yield of Alloy in ANS-OB Ladle Refining Process and Prevention;
影响ANS-OB精炼合金收得率的因素及对策
2.
PERFORMANCE AND QUALITY OF C C. SLAB MADE FROM LIQUID STEEL、BY ANS-OB TREATMENT AND ITS ROLLED PRODUCTSOI;
ANS-OB钢水处理连铸板坯及轧材质量性能的研究
6)  OB Glue
OB胶
1.
Researching on the method of treating pneumothorax with OB glue via fiberbronchoscopy;
纤维支气管镜代胸腔镜OB胶治疗气胸的方法研究
参考词条
补充资料:承包人要求发包人提供资料的权利
承包人要求发包人提供资料的权利:根据《合同法》第285条规定,因发包人变更计划,提供的资料不准确,或者未按照期限提供必要的勘察、设计工作条件而造成勘察设计的返工、停工或者修改设计,发包人应当按照勘察人、设计人实际损耗的工作量增付费用。解释如下:发包人按照合同约定提供开展勘察设计工作所需要的基础资料、技术要求并对提供的时间、进度和资料的可靠性负责;按照合同的约定提供必要的协作条件,勘察合同的发包人在勘察工作前,应当提供勘察、设计工作所需要的的勘察基础资料,勘察技术要求及附图;设计的基础资料,设计的技术要求,在设计前还有提供批准的计划任务书、地址报告,以及原料(或经批准的资源报告)、燃料、水、电运输等方面的协议文件和满足初步设计的资料。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。