说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 可靠性增长试验规划
1)  Reliability Growth Test Programming
可靠性增长试验规划
2)  Reliability growth plan
可靠性增长规划
3)  reliability growth test
可靠性增长试验
1.
Tentative research about reliability growth test of diminutive solenoid valve;
小型电磁阀可靠性增长试验的初步研究
2.
The analysis of a TT&C radar′s reliability growth test;
某航天测控雷达的可靠性增长试验方法探析
3.
Research into the reliability growth test plan of missile launcher;
导弹发射装置可靠性增长试验计划的研究
4)  Planning Curve of Reliability Growth Test
可靠性增长试验计划曲线
1.
To Protract on the Planning Curve of Reliability Growth Test;
关于可靠性增长试验计划曲线的绘制
5)  reliability preexposure and growth testing
可靠性摸底增长试验
6)  accelerated reliability growth test
加速可靠性增长试验
1.
They include reliability synthesis of complex system, variable statistics of reliability, high reliable system consisted of low reliable units, reliability synthesis of complex system contained reliability growth units, accelerated life test, accelerated reliability growth test, product life prediction and reliability assessment of engin
这些方向包括复杂系统的可靠性综合,可靠性变动统计学,低可靠元件组成高可靠系统,含增长单元的复杂系统的可靠性综合,加速寿命试验,加速可靠性增长试验,产品寿命预测及发动机可靠性评估。
补充资料:《北美电力可靠性协会规划标准》


《北美电力可靠性协会规划标准》
North American Elec-tric Reliability Coun-cil planning standard

  保证电力系统稳定性和可靠性的关键元件。这些控制必须与发电机保护配合,以尽量减少在不正常电压、电流和颇率造成的扰动情况下发电机跳闸。发电机励磁控制是电力系统动态电压控制的重要方法,因此励磁设备(励磁机、电压调整器和电力系统稳定器)良好的运行性能,对电力系统稳定是重要的。原动机控制(调速器)是系统频率调整的主要方法。发电机控制和保护必须设计得既能使发电机在不正常情况下支持互联电力系统又能恰当地保护发电设备使之不致损坏。 (4)自动低频减负荷。自动低频减负荷对防止全系统崩演,保护发电和物电设施免受损坏,提供合理的减负荷和保证互联系统的可靠性有重要作用。因此各区域应制定自动低频减负荷方案(包括低频解列方案),并应与相邻区域的方案、发电机控制和保护系统、自动低压减负荷方案,区域负荷恢复方案及翰电保护和控制系统相配合。还应注意是否会引起过频率、过电压或拍电线过负荷,并采取适当的措施。 (5)自动低压减负荷。电压不稳定能造成发电机和枪电设施的跳闸,其结果是失去用户负荷,甚至导致系统崩溃。由于电压崩溃可能突然发生,使调度人员没有足够的时间稳定系统,因此在系统一部分中装设自动低压减负荷装置可能是稳定互联系统和防止电压崩演的一项有效措施。因此自动低压减负荷方案必须由各区域制定并在实施中与相邻区域协调。此外,所有低压减负荷方案应与发电机控制和保护系统,自动低颇减负荷方案,区城负荷恢复方案和翰电保护和控制方案相配合。还应注意是否会引起过频率、过电压或翰电线过负荷,并采取相应的措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条