说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 开发顺序
1)  development subsequence
开发顺序
1.
Under the premise of actuality of analysis of HanJiang River s hydroelectric development, study rolling development subsequence and operation of cascade hydroelectric with System science method, in response to main prolem in the course of HanJiang River .
本文从分析汉江上游水电能源开发现状入手,根据汉江梯级水电站开发中存在的主要问题,以经济效益和社会效益最大化为原则,采用系统科学的方法研究汉江梯级的滚动开发顺序;梯级电站的运行方式等:然后在此基础上分析回顾我国水电开发管理的历史,结合国内外先进的管理模式,提出汉江水电站梯级开发的建议模式,实现四位一体、综合开发的目标。
2)  the gradation of cascade development
梯级开发顺序
3)  mining order
开采顺序
1.
According to the reasonable seam mining order and mine production scale,arranging the normal face replacement and corresponding driving engineering,the reasonable relation between mining and driving can be kept.
根据煤层的合理开采顺序和矿井生产规模,安排好正常的采煤工作面接替和相应的巷道掘进工程,才能保持合理的矿井采掘关系。
2.
This paper analyses the failure process of the slope under different underground mining sequence from the angle of analysis of the slope failure feature due to combining mining,and the mining order is optimized,.
本文从联采对露天边坡破坏特征分析的角度,分析不同井工开开采部位下边坡的破坏过程,并优化其开采顺序。
4)  mining sequence
开采顺序
1.
The industrial indexes of the deposit, mining sequence and the gro- uping emptied stopes are analyed and discussed, and the reasonable and viable schemes are brought up, whichguarantees the rationality and the feasibility of mining in Changba-Lijiagou lead-zinc mining area.
从厂坝—李家沟铅锌矿区的现状出发,指出了进行矿山开采设计的难点,并从矿床工业指标、开采顺序和群采空区几个方面进行分析讨论,提出了合理可行的解决方案,保证了厂坝—李家沟铅锌矿区开采的合理性和可行性。
2.
This paper anylises the cause of the inefficient ore production in Gaoshan Ming Area of these years, points out the exsiting problom,and based on analysing, calculating, remaking mine progress plan,puts forth rational mining sequence about this deposit and adoptable productiveness of Gaoshan Mining Area.
并通过分析、计算及采掘进度计划的重新编制,提出了该矿床合理的开采顺序及高山采区适宜的生产规模。
5)  sequenced opening
顺序开模
1.
Several mechanisms such as forced stripper, sequenced opening, delayed goring of the sliding core are applied in the design.
模具结构中采用了定模强制脱模 ,顺序开模 ,滑动型芯延时顶出等机构。
6)  opening sequence
开启顺序
补充资料:Pro/E二次开发使用toolkit开发trigger的程序

使用toolkit开发trigger的程序时,往往需要能够连续通过trigger来触发dll中的函数.
我碰到的问题:
   1.配置trigger:
   Name: CimDll
   Event: Create PIV
   Time:  POST
   RequireNO
   DLL:Cim.dll
   Function:PDMTPIVCreatePostOperation
   
  2.源代码:
   int PDMDLLInit()
{
   PTCERROR pdm_status;
   FILE      *g_pfileLog;
   g_pfileLog =fopen("test.dat","w");
   setbuf(g_pfileLog,NULL);
   fprintf(g_pfileLog,"begin test\n");
   pdm_status = PDMTriggerRegister("PDMTPIVCreatePostOperation", PDMTPIVCreatePostOperation);
   if (pdm_status != PDM_SUCCESS)
   {  
    printf("Failed to Register Trigger PIV Create Post.\n");
   }
    return (pdm_status);
}


int PDMTPIVCreatePostOperation(int argc, void **argv)
{
   fprintf(g_pfileLog,"test\n");
   .....
   fprintf(g_pfileLog,"end test\n");
   fclose(g_pfileLog);


}


   结果:以上代码存在的问题:如果我们在第一次checkin到C/S中后,删除test.dat文件,然后再进行checkin时,发现没有再生成test.dat,在函数PDMTPIVCreatePostOperation()中所进行的对文件的操作都无效.
   原因:我们使用trigger触发时,真正起作用的是函数:PDMTPIVCreatePostOperation(),而PDMDLLInit()只是在第一次checkin时起作用,所以在第一次调用PDMTPIVCreatePostOperation()后,我就fclose(g_pfileLog),所以出现了上面的情况.所以注意的是:不要把一些重要的东西放在函数PDMDLLInit()中.

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条