1) high RCC
高碾压混凝土
1.
The high RCC gravity dam of Longtan Hydroelectric Station is the highest gravity dam in the world, but the RCC darn only has 30 years history.
通过研究施工过程中的坝体不稳定温度场和不稳定温度徐变应力场,从而探讨高碾压混凝土在通仓浇筑、连续上升时的温度场和应力场的特点和分布规律,为温控措施提供理论和数据参考。
3) roller compacted concrete dam(RCCD)
碾压混凝土高坝
4) RCC
碾压混凝土
1.
Mechanism and model of sulfate attack on RCC with expansive agent;
含膨胀剂的碾压混凝土抗硫酸盐侵蚀机理与理论模型
2.
Design of RCC Arch Dam for Xiaqiao Hydropower Station;
下桥水电站碾压混凝土拱坝设计
3.
RCC dam seepage field of finite element analysis;
碾压混凝土重力坝体渗流场有限元分析
5) roller compacted concrete
碾压混凝土
1.
Experimental research on soundness of roller compacted concrete mixed with MgO;
碾压混凝土外掺MgO安定性试验研究
2.
Construction techniques for roller compacted concrete dam In left bank of Longtan Hydropower Station;
龙滩大坝左岸坝段碾压混凝土施工技术
3.
Study on relationship between permeability coefficient and impermeability mark of roller compacted concrete;
碾压混凝土渗透系数与抗渗标号关系研究
6) roller compacted concrete(RCC)
碾压混凝土
1.
Compressive strength(R_c)、splitting tensile strength(R_(pl))、axis tensile strength(R_l) and body shear strength of roller compacted concrete(RCC) are investigated.
本文对碾压混凝土的抗压强度、抗拉强度及本体抗剪强度这三个最重要的力学性能进行深入研究,目的是为现有的理论提供可靠的依据。
2.
The permeability and leakage dissolution properties of roller compacted concrete(RCC) in different hydraulic slope are obtained by tests.
通过试验获得了碾压混凝土在不同水力梯度下的渗透特性及溶蚀特性 ,结合孔结构测试结果 ,研究了影响碾压混凝土渗透溶蚀特性的因素 ,为解决碾压混凝土在高水力梯度下是否会造成渗透溶蚀破坏提供依据 。
3.
A portion of inferior roller compacted concrete(RCC) and cracks in Shuidong gravity dam caused serious leakage and calcium precipitation,and threatened the safe operation of the dam;the reinforcement for the dam and implemented result are described.
水东坝因部分碾压混凝土质量较差,产生裂缝,导致坝体严重渗漏和析钙,影响其安全运行。
补充资料:福建省第二座碾压混凝土坝——龙门滩一级水库
福建省第二座碾压混凝土坝——龙门滩一级水库
目 福建省第二座碾压混凝土坝— 龙门滩一级水库
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条