1) reinforced concrete frame structure buildings
钢筋混凝土框架结构建筑物
1.
The control blasting demolition of reinforced concrete frame structure buildings often produces different results with the difference of blasting parameter and demolition project in the blasting design, but the theory of control blasting demolition is the same.
钢筋混凝土框架结构建筑物控制爆破拆除常因设计中的爆破参数和拆除方案不同而产生不同的结果,但是控制爆破拆除原理是相同的。
2) RC frame
钢筋混凝土框架结构
1.
In this research,the nonlinear static procedures with different lateral load patterns were compared by using incremental dynamical analysis method based on a six-storey and a ten-storey RC frame fiber model.
以两个普通六层和十层钢筋混凝土框架结构为例,采用基于纤维模型的逐步增量弹塑性时程方法得到的层间剪力-位移关系曲线,与不同侧力模式的推覆分析结果进行了对比,研究了推覆分析结果的可靠程度。
2.
According to the characteristics of RC frames, its seismic performance is divided into three levels:serviceability,life-safety, and collapse protection.
根据钢筋混凝土框架结构的特点,将其性能划分为使用良好、人身安全和防止倒塌三个水平,并用层间位移角限值予以量化;用作用倒三角形水平分布荷载的等截面悬臂柱的侧移曲线作为框架结构的初始侧移模式。
3) reinforced concrete frame structure
钢筋混凝土框架结构
1.
The appraisal and strengthening design of reinforced concrete frame structure;
某钢筋混凝土框架结构的鉴定与加固设计
2.
Against these deficiencies,a mathematical model of all parameters full constraints optimization of reinforced concrete frame structure design was established in this paper.
与当前的钢筋混凝土框架结构优化设计相比,本文具有较强的实用性、寻优计算快捷等优点。
3.
When they are applied in the traditional earthquake damage prediction method of reinforced concrete frame structure,we can get the structural damage values of two earthquakes.
利用文献[2]推荐的方法得到了不同地震组合情况下的等效地震影响系数,将其与传统的钢筋混凝土框架结构震害预测方法相结合,得到两次地震作用对建筑物所造成的损伤,进而得到了该类建筑物的群体震害预测结果。
4) reinforced concrete frame
钢筋混凝土框架结构
1.
Study on relationship between structural cost and failure probability of reinforced concrete frames;
钢筋混凝土框架结构造价与失效概率之间的近似关系研究
2.
Analysis of influence of material damping on the dynamic response of reinforced concrete frame structures;
材料阻尼对钢筋混凝土框架结构动力响应影响分析
3.
Because of increasing awareness of quality,the pursuit of reinforced concrete frame finishing quality has reached such a high level that mirror finish is desired.
由于人们质量意识的提高,对钢筋混凝土框架结构表面质量已上升到追求镜面效果的高度,生产镜面混凝土的能力以及镜面实施效果能充分体现一个施工企业的市场竞争实力。
5) RC frame structure
钢筋混凝土框架结构
1.
Applied Research for Seismic Appraiser and Retrofit Methods of RC Frame Structure;
钢筋混凝土框架结构抗震鉴定及加固方法的应用研究
2.
Considering nonlinear seismic responses with the elastic-plastic inter-story drift augmentation coefficient method,seismic reliability analysis was performed to a multi-story regular RC frame structure through the mean-variance method and deformation damage criterion.
对现有混凝土结构的几种常用地震破坏准则进行了简要的归纳与总结,结合一钢筋混凝土框架结构,在求得配筋结构层间极限变形能力的基础上,利用弹塑性层间位移增大系数法直接统计层间位移的反应结果,采用变形破坏准则的一次二阶矩法对考虑非线性因素的钢筋混凝土框架结构的抗震可靠度问题进行了分析,探讨了这一方法的实施要点。
3.
On the basis of the definition of maintenance fai1ure of sectional constraints for RC driae structure under medium earthquakes, making use of nonlinear random analysis program of earthquake action to RC frame structures, the maintenance failure correlation under medium earthquakes is studied in this paper.
在定义框架结构截面效应约束维修失效的基础上,利用钢筋混凝土框架结构非线性随机模拟地震反应分析程序,研究了在役框架结构在中震作用下截面效应约束的失效相关性。
6) reinforced concrete frame structures
钢筋混凝土框架结构
1.
Design of earthquake damage prediction system of reinforced concrete frame structures based on GIS technology;
基于GIS技术的钢筋混凝土框架结构震害预测系统设计
补充资料:多层厂房预制钢筋混凝土框架结构安装
多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building
定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条