说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 卡群一级水电站
1)  Kaqun First-cascade Hydropower Station
卡群一级水电站
1.
In order to eliminate the shock wave in the steep bend channel,a new measure of the combination of energy dissipa- tion grid and diversion dissipation plate has been adopted in the Kaqun First-cascade Hydropower Station.
卡群一级水电站为消除陡坡弯道冲击波采取了消能栅和导流消能板新措施。
2)  Wokahe First cascade Hydro Station
沃卡河一级水电站
1.
The forebay of the Wokahe First cascade Hydro Station is located in the deformation rock body with a bad quality.
沃卡河一级水电站前池位于变形体上 ,岩体质量较差 ,具有不均性和强透水的特性 ,是西藏地区比较典型的地质条件之一 ,其基础处理难度较大。
3)  cascade hydropower stations
梯级水电站群
1.
(2)The cascade hydropower stations with tight relationships should be taken into account integrally.
所提出的出力受阻研究思路为:(1)水电站出力过程首先要符合电力系统的负荷需要,尤其是尖峰时段的需要,这时的出力受阻的控制特别关键,而非尖峰时段系统对出力受阻的承受能力相对较大;(2)联系紧密的梯级水电站群的出力受阻要统一考虑;(3)应全面考虑电力负荷、电站及其综合利用等,从梯级水电站群联合日优化调度的角度研究。
2.
The model for calculating the firm power of cascade hydropower stations is a large scale maxmin model, an efficient algorithm named effective calculating period algorithm (MM-NC-A) for simplifying the calculation of it is presented in this paper.
梯级水电站群长序列保证出力优化计算模型是一个大规模maxmin模型。
4)  Jinping Ⅰ Hydropower Station
锦屏一级水电站
1.
Jinping Ⅰ Hydropower Station Dam Site Left Abutment High Slope Complicated Rock Mechanics Problems and Engineering Treatment Measures;
锦屏一级水电站坝区左岸高边坡复杂岩石力学问题及工程治理措施研究
2.
Jinping Ⅰ Hydropower Station Silicarenite Alkaline Activity Tests;
锦屏一级水电站石英砂岩碱活性试验研究
3.
Quarry Planning and Aggregate Processing System Design of Jinping Ⅰ Hydropower Station;
锦屏一级水电站料场规划及砂石加工系统方案设计
5)  Jinping first stage hydropower station
锦屏一级水电站
1.
Study on stability of Monkey slope of Jinping first stage hydropower station;
雅砻江锦屏一级水电站枢纽区猴子坡稳定性分析
2.
The deep fracture regularity of Pusiluogou left abutment slope at Jinping first stage hydropower station is comprehensively studied; and four deformation models of deep fracture are put forward; they are gentle shear and steep tension, gentle shear-tension belt, steep shear and gentle tension as well as tension respectively.
通过对锦屏一级水电站普斯罗沟坝址左岸深部裂缝的发育特点及规律的研究,提出了深部裂缝4种变形模式,即缓剪陡张型、缓倾张剪带型、顺剪反张型和引张型。
3.
At first,the slope geological conditions as well as dam site geostress and deep fractures in the left bank of Jinping first stage hydropower station have been investigated.
对锦屏一级水电站边坡工程地质条件、坝址区实测地应力分布及左岸深部裂缝发育规律进行全面分析,采用UDEC和3DEC离散元程序模拟锦屏一级水电站河谷的演化发展,对河谷边坡不同演化阶段应力场的变化规律及变形与卸荷分带规律进行深入分析。
6)  Jinping-Ⅰ Hydropower Station
锦屏一级水电站
1.
Seepage Calculation and Stability Analysis on Left Slope of Jinping-Ⅰ Hydropower Station;
锦屏一级水电站左岸边坡渗流计算及稳定性分析
2.
Design of river closure of Jinping-Ⅰ Hydropower Station;
锦屏一级水电站大江截流设计
补充资料:卡伦Ⅳ水电站

卡伦Ⅳ水电站

Karun Ⅳ Hydropower Station


概  述

  卡伦水电站(Ⅳ)位于伊朗恰哈勒马哈勒-巴蒂亚里省、卡伦(Karun)河上,距沙赫尔库尔德市180km。工程主要用于发电和防洪。混凝土重力拱坝,最大坝高222m,水库总库容为21.9亿m3,水电站装机容量100万kW,年发电量21.6亿kW·h。工程于1997年开工,计划2006年竣工。
  坝址位于卡伦河与蒙季(Monj)河汇流处上游不远处,坝址两岸岩体陡峭坚固。基岩为灰岩,分上、下两层。爆破钻孔表明,84%的岩层为中、高强度。
  水库有效库容8.82亿m3,可调节利用的年径流量为37.56亿m3
  工程主要建筑物有:大坝、溢洪道、电站厂房以及蒙季河引水系统等。
  大坝为混凝土重力拱坝,基础以上最大坝高222m,坝顶长度574.5m,坝体顶部厚度为7.0m,底部为118.0m。坝体上游坝面垂直,下游坝面坡度为1∶0.4。坝体混凝土总量约为240万m3
  溢洪道设在坝体中央,溢洪道总长81m,分成5孔,在千年一遇洪水下,最大泄洪量为10890m3/s。溢流堰底槛高程为1012m。溢洪道下游设有挑坎和消力池,消力池深30m,溢洪道下部坝体内设有2个放空水库用的泄流底孔,进口高程为900m,其下泄的水流进入溢洪道的消力池。
  电站厂房为坝后式地面厂房,位于卡伦河的左岸,内设4台竖轴混流式水轮发电机组,单机容量为25万kW,引用流量182m3/s。厂房引水系统包括坝体左侧4条引水管道和压力钢管。引水管进口高程为945m;每根引水管道下方接直径为6.5m的压力钢管。
  蒙季河引水系统是将蒙季河的水(该河的多年平均流量为11.26m3/s)引入卡伦(Ⅴ)坝水库。该系统包括一库低坝、一个泄水闸、引水隧洞和输水隧洞。引水隧洞最大过流量为25m3/s,进口配备了3扇滑动闸门(2×2m);输水隧洞内径4.0m,大致长度为3200m,纵向坡度约为1.82%。
  导流隧洞布置在右岸,分上、下两条,内径均为9.5m,长度分别为615m和635m。上面的一条隧洞在每年的9个月(枯水期)期间用作交通通道。
  上游围堰高45m,下游围堰高15m,两座围堰均为土石围堰。
  设计混凝土总方量为240万m3

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
天生桥一级水电站水库  杨溪水一级水电站  梯级电站群  吉林台一级水电站 
  ©2011 dictall.com