说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 正装法
1)  forward-calculation method
正装法
2)  water filling upwards construction method
充水正装法
1.
The construction process of the single pan of a floating roof tank using water filling upwards construction method has been improved.
针对充水正装法施工浮顶罐时单盘的施工工艺进行了改进,无需在罐内搭设满堂红钢架,而是直接在罐底板上铺设焊接单盘,然后水浮提升单盘。
3)  orderly-erecting analysis method
正装分析法
1.
A new method combinating Kalman s filtering method and orderly-erecting analysis method was put forward to improve the analysis and computation precision of structure for the construction control of bridges with large span.
为了提高大跨度桥梁施工控制中结构分析计算的精度,提出将Kalman滤波法和正装分析法结合起来进行施工控制的分析计算。
4)  forward iteration method
正装迭代法
1.
The forward iteration method is used to determine the rational construction state of the Jianghan Fourth Bridge in Wuhan(a symmetric single pylon PC cable stayed bridge).
采用正装迭代法确定武汉江汉四桥(不对称独塔PC斜拉桥)的合理施工状态,准确模拟了主桥施工过程,分析了主桥合龙方案。
5)  forward-calculating optimization method
正装优化法
6)  water-float upward erection method
水浮正装法
补充资料:正-正晒片法

正-正晒片法(Positive-positive printing process),针对负-正晒片法而言,从彩色反转片晒制照片时所采取的方法。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条