说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 夏寨水库
1)  XiaZhai reservoir
夏寨水库
2)  Sizhai Reservoir
四寨水库
1.
Integral non-linear stability analysis and safety evaluation for high gravity pier-arch dam at Sizhai Reservoir;
四寨水库高重力墩拱坝整体非线性分析和安全评价
3)  Duzhai Reservoir
杜寨水库
1.
Discussion on the Measures for the Transformation of the Spillway of Duzhai Reservoir
杜寨水库溢洪道改造措施
4)  Wanjiazhai Reservoir
万家寨水库
1.
Study on water taking from Wanjiazhai Reservoir and storage capacity of North Trunk Line of Yellow River Delivery Project;
万家寨水库取水和引黄工程北干线水量调蓄研究
2.
The Dispatch of Wanjiazhai Reservoir and Its Main Contradiction;
万家寨水库调度及其主要矛盾
3.
Recharge of the Wanjiazhai Reservoir to karst groundwater;
万家寨水库对库区岩溶地下水的补给作用
5)  the Wanjiazhai Reservoir
万家寨水库
1.
Effect of the Wanjiazhai Reservoir Operation on Ice Prevention Upstream and Downstream;
万家寨水库运用对上下游河段防凌的影响
2.
Evaluation of Researches on Operational Mode of the Wanjiazhai Reservoir on the Yellow River in the Ice-Period;
万家寨水库凌汛期运用方式研究综述
6)  Gelaozai Hydropower Station
格老寨水库
补充资料:万家寨水库
万家寨水库
万家寨水库

黄河万家寨水库位于黄河北干流上段托克托至龙口河段峡谷内,其左岸为山西省偏关县,右岸为内蒙古自治区准格尔旗,是黄河中游八个梯级规划开发的第一个,是以供水、调峰发电为主,同时兼有防洪、防凌等综合效益的国家一等大(i)型水利枢纽工程,总库容8.96亿m3,总装机容量108万kwh。主体工程于1994年11月3日开工,1998年10月1日下闸蓄水,1998年11月28日首台机组发电,2000年底六台机组全部发电,2001年底给太原进行了试供水,工程实际总投资49.14亿元人民币。目前工程的单项验收或鉴定已完毕,正准备工程的全面验收,尔后投入正式运营。

万家寨水库控制流域面积39.48万km2,多年平均径流量248亿m3,多年平均流量790 m3/s,多年平均输沙量1.49亿t;年供水量14亿m3,其中向内蒙古自治区准格尔旗供水2.0亿m3,向山西平朔、大同供水5.6亿m3,向太原供水6.4亿m3。枢纽发电后,电力分别接入山西及蒙西电网。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条